Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

PRO is currently experiencing an outage. Some documents and records may not be available on PRO momentarily. We apologize for the inconvenience and are working to restore full access.

Permit Number: T11CM02578
Parcel: 128102960

Review Status: Completed

Review Details: COMMERCIAL - TI

Permit Number - T11CM02578
Review Name: COMMERCIAL - TI
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
08/17/2011 DAVID RIVERA ZONING REVIEW Approved
08/17/2011 ROBERT SHERRY MECHANICAL-COMMERCIAL REVIEW Denied Revise the ventilation calculations to reflect the actual use of room 124:telephone/data entry, not office space. Reference: Table 6-1, ASHRAE Standard 62.1-2004.
08/17/2011 LEERAY HANLY ELECTRICAL-COMMERCIAL REVIEW Approved
08/17/2011 ROBERT SHERRY WATER REVIEW Approved
08/17/2011 ERIC NEWCOMB BUILDING-COMMERCIAL REVIEW Denied 1. SHEET D3.1; CODE REVIEW (PLUMBING FIXTURES): INCLUDE DRINKING FOUNTAINS IN THE PLUMBING FIXTURES (REQUIRED AND PROVIDED).
2. SHEET D3.1; CODE REVIEW (TENANT LOAD): CHECK THE OCCUPANCY LOAD STATED ON SHEET D3.1 COMPARED TO THE LAYOUT SHOWN ON SHEET A3.1 FLOOR PLAN.
3. SHEET D3.1; CODE REVIEW (TENANT LOAD): THE TENANT LOAD IS LISTED AS 123 OCCUPANTS, AND SHOULD BE 248. REVISE.
4. SHEET D3.1: PER THE 2006 IBC, SECTION 3409.7, INDICATE ON THE DRAWINGS HOW A MAXIMUM OF 20% OF THE VALUATION ON THIS PROJECT IS SPENT ON ACCESSIBILITY.
5. GENERAL: SHOW EGRESS AND NUMBER OF OCCUPANTS EXITING AT EACH LOCATION. INCLUDE OCCUPANTS FROM THE SECOND FLOOR.
6. GENERAL: PROVIDE WRITTEN RESPONSES TO ALL REVIEW COMMENTS.
08/17/2011 RSHERRY1 WWM REVIEW Passed No new plumbing fixtures.
08/17/2011 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Passed
08/17/2011 JASON GREEN ENGINEERING REVIEW Approved
08/17/2011 DAVE MANN FIRE REVIEW Denied Occupant load must be based on number of actual seats. Please provide exiting diagram with loads and dimensions.
08/17/2011 ERIC NEWCOMB ADA REVIEW Passed
08/17/2011 BETH GRANT COMMERCIAL IMPACT FEE COMMERCIAL IMPACT FEE PROCESSING Passed