Permit Number: T11CM02508
Parcel: 117040770

Address:
307 E 5TH ST

Review Status: Completed

Review Details: PLANS OK TO SUBMIT - RES

Permit Number - T11CM02508
Review Name: PLANS OK TO SUBMIT - RES
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
08/10/2011 MICHAEL ST. PAUL ZONING REVIEW Denied CDRC TRANSMITTAL


FROM: Michael St.Paul, Planning Technician

PROJECT:
T11CM02508
307 East 5th Street
New SFR


TRANSMITTAL: August 10, 2011


COMMENTS: Please attach a response letter with the next submittal, which states how all Zoning Review Section comments regarding the Land Use Code and Development Standards were addressed.


This site is in the HR-3 Zone. Historic review is required (LUC Section 2.8.8.2 & 2.8.8.5). (This project is scheduled for historic review.)

The Development Designator for a single-family residence (SFR) the HR-3 zone is "I" (LUC Sections 2.3.6.2.A.1 & 3.2.3.1.B). The Perimeter Yard Indicator is AA (LUC Section 3.2.6.4).

The required setback to an interior lot line equals the setback of each wall (LUC Section 3.2.6.4). The height of the SFR facing the east property line is thirteen (13) feet. The required setback equals the height of thirteen (13) feet (LUC Sections 3.2.3.1.B & 3.2.6.4). The proposed setback is three (3) feet, six (6) inches to the north property.

Depict with dimensions the street center line and curb and sidewalk information on the plot plan LUC Section 3.2.6.5.A ( DS 2-02.A.2.1.21).

The minimum setback to the front property line is the greater of twenty (20) feet or one and one half the height (1 ½ H) (LUC Section 3.2.6.5.A). The building height facing the front (north) property line is twenty (20) feet, four (4) inches. The required setback is thirty (30) feet, six (6) inches.
08/10/2011 MICHAEL ST. PAUL NPPO REVIEW Passed
08/15/2011 LAITH ALSHAMI ENGINEERING REVIEW Approved
08/15/2011 CLAYTON TREVILLYAN BUILDING-RESIDENTIAL REVIEW Needs Review