Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Number: T11CM02478
Parcel: 10408093B

Review Status: Completed

Review Details: RESUBMITTAL - SITE

Permit Number - T11CM02478
Review Name: RESUBMITTAL - SITE
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
10/19/2011 STEVE SHIELDS ZONING REVIEW Denied PDSD TRANSMITTAL

FROM: Steve Shields
Lead Planner

PROJECT: Infiniti of Tucson - Expansion
T11CM02478
Site Plan (2nd Review)

TRANSMITTAL DATE: October 19, 2011

COMMENTS: Please resubmit revised drawings and a response letter, which states how all Zoning Review Section comments regarding the Land Use Code and Development Standards were addressed.

1. This site plan was reviewed for compliance with the City of Tucson Development Standards (D.S.) and Land Use Code (LUC) for full code compliance for the areas of expansion and any changes to the site.

2. D.S. 2-02.2.1.A.9 The Short Term bicycle parking location does not appear to meet the requirements of LUC Section3.3.9.3.B

3. D.S. 2-02.2.1.A.9 The Short Term bicycle parking detail does not meet the requirements of LUC Section 3.3.9.2.B.

4. D.S. 2-02.2.1.A.9 As Development Standard 2-09.0 is no longer applicable remove all references from the plans.

5. D.S. 2-02.2.2.A.4 The Long Term bicycle parking calculation is not correct. Per LUC Section 3.3.8.2.B Retail Trade Use Group, Vehicle Rental and Sales, 1 space per 12,000 sq. ft. GFA. Minimum is 2 spaces. Based on 13,662 sq. ft building the Minimum number of 2 is the required.

6. D.S. 2-02.2.2.A.6 Zoning was not able to locate the percent of building expansion on the site plan.

7. Depending on how the above comments are addressed additional comments may be forth coming.

If you have any questions about this transmittal, please contact me at Steve.Shields@tucsonaz.gov or (520) 837-4956.

C:\planning\site\2011\t11cm02478

RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised site plan.
10/27/2011 RONALD BROWN HC SITE REVIEW Approved
11/02/2011 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Approved

Final Status

Task End Date Reviewer's Name Type of Review Description
11/14/2011 DELMA ROBEY OUT TO CUSTOMER Completed