Permit Number: T11CM02433
Parcel: 11615088L

Review Status: Completed

Review Details: SITE

Permit Number - T11CM02433
Review Name: SITE
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
08/04/2011 DAVE MANN FIRE REVIEW Approved
08/04/2011 RONALD BROWN H/C SITE REVIEW Denied 1. Please provide the latest aopproved site development plan showing all existing approved accessible marked crossings, passenger loading zones, parking, ramps and connecting accessible routes.
a. From the aerial photos, there appears to be an existing passenger loading zone that is not replaced with the new design. Please provide an accessible loading zone as per the 2006 IBC, Section 1106.7 and ICC/ANSI 117.1, Section 503.
b. There also appears to be two marked crossings providing access to the accessible parking that are being modified in the new design but not being fully brought up to code compliance. Please provide new painted marked crossings and detectable warnings at both end of the marked crossings. Please confirm that any existing ramps are in compliance with the ICC/ANSI 117.1, Sections 405 or 406 as applicable.
END OF REVIEW
08/15/2011 ANDREW CONNOR NPPO REVIEW Approved
08/24/2011 ELIZABETH EBERBACH ENGINEERING REVIEW Denied FOR: Mark Bollard, R.A.
SUBJECT: 1601 W Saint Mary's Rd Canopy Review
REVIEWER: Elizabeth Leibold, P.E.
DATE: August 30, 2011
ACTIVITY NUMBERS: T11OT01527 (floodplain use permit), T11CM02433

SUMMARY: Engineering Division of Planning & Development Services Department has received the submittal for the above referenced property and has reviewed the documents under T11CM02433. Engineering Division of Planning & Development Services Department does not recommend approval of T11OT01527 or T11CM02433 until the following comments are addressed.

COMMENTS:
1) Clarify canopy attachment to the main structure on planviews. Be aware that if the new structures are attached to the main structure, the project will be required to submit substantial improvement paperwork for this project.
2) Clarify roof drainage downspouts and existing storm sewer system. See also Plumbing comments.

For any questions, call me at 837-4934.

Elizabeth Leibold, P.E., CPM, CFM
Civil Engineer
Engineering Division
Planning & Development Services Department
08/30/2011 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Passed