Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - BLDG/FIRE/ZONING/ENG
Permit Number - T11CM02433
Review Name: COMMERCIAL - BLDG/FIRE/ZONING/ENG
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
08/04/2011 | RONALD BROWN | BUILDING-COMMERCIAL | REVIEW | Denied | 1. Please provide special inspection certifications for required inspections as outlined on sheet S1.3. These must be submitted for review and approval prior to permit issuance. END OF REVIEW |
08/04/2011 | DAVE MANN | FIRE | REVIEW | Approved | |
08/24/2011 | ELIZABETH EBERBACH | ENGINEERING | REVIEW | Denied | FOR: Mark Bollard, R.A. SUBJECT: 1601 W Saint Mary's Rd Canopy Review REVIEWER: Elizabeth Leibold, P.E. DATE: August 30, 2011 ACTIVITY NUMBERS: T11OT01527 (floodplain use permit), T11CM02433 SUMMARY: Engineering Division of Planning & Development Services Department has received the submittal for the above referenced property and has reviewed the documents under T11CM02433. Engineering Division of Planning & Development Services Department does not recommend approval of T11OT01527 or T11CM02433 until the following comments are addressed. COMMENTS: 1) Clarify canopy attachment to the main structure on planviews. Be aware that if the new structures are attached to the main structure, the project will be required to submit substantial improvement paperwork for this project. 2) Clarify roof drainage downspouts and existing storm sewer system. See also Plumbing comments. For any questions, call me at 837-4934. Elizabeth Leibold, P.E., CPM, CFM Civil Engineer Engineering Division Planning & Development Services Department |
08/30/2011 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Denied | 1. Specify the size of the gutters and downspouts used for the canopies. Show the location of each downspout. Reference: Sections 106.3.1 and 1106.6, IPC 2006. 2. The downspout depicted in detail 2/1A5.0 appears to be directly-connected to an 8"-storm drain. Provide an accessible cleanout at the base of each downspout prior to connection to the horizontal storm drain. Reference: Section 1101.8, IPC 2006. 3. Show the route of the storm drain piping to its termination or connection to an existing storm sewer system. Reference: Sections 106.3.1 and 1101.2, IPC 2006. |
08/30/2011 | LEERAY HANLY | ELECTRICAL-COMMERCIAL | REVIEW | Approved |