Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - TI
Permit Number - T11CM02418
Review Name: COMMERCIAL - TI
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
08/04/2011 | TERRY STEVENS | ZONING | REVIEW | Denied | Devlopment plan (D11-0023) must be completed and approved prior to approval of the tenant improvement. |
08/04/2011 | JASON GREEN | ENGINEERING | REVIEW | Denied | August 4, 2011 The TI application has been reviewed and approved by the Engineering Section. The TI building plan is denied until further information is provided for review purpose. - Provide the last approved site plan showing the location of the TI improvment in plan view. If the TI is for the existing building the TI can be approved over the counter with the last approved site plan. -If the TI improvement is for the new building expansion under the new Development Plan D11-0023 then the TI will be approved once the DP Package is approved through CDRC. -Clearly show where this improvement is going on an approved site plan. Jason Green, CFM |
08/05/2011 | LEERAY HANLY | ELECTRICAL-COMMERCIAL | REVIEW | Passed | SEE ACTIVITY T11CM02309 FOR M,P,E IN THIS VAULT |
08/08/2011 | LEERAY HANLY | MECHANICAL-COMMERCIAL | REVIEW | Passed | SEE ACTIVITY T11CM02309 FOR M,P,E IN THIS VAULT |
08/08/2011 | LEERAY HANLY | BUILDING-COMMERCIAL | REVIEW | Denied | Structural engineered component ok for foundation, walls, roof beams and LINAC duct. General notes indicate that there are drawings from Veritas which have not been included in this plan set, please provide those drawings as they may resolve the following 3 corrections. 1) Please clarify attachment methods of shielding components at roof and walls (lead, Verishield blocks) 2) Please clarify how duct penetrations for supply and return air are to be made into this vault. Detail any specialized system shielding. 3) Detail any other penetrations such as for electrical and plumbing that may require specialized treatment. |
08/08/2011 | LHANLY1 | WATER | REVIEW | Passed | SEE ACTIVITY T11CM02309 FOR M,P,E IN THIS VAULT |
08/08/2011 | LEERAY HANLY | PLUMBING-COMMERCIAL | REVIEW | Passed | SEE ACTIVITY T11CM02309 FOR M,P,E IN THIS VAULT |
08/08/2011 | LHANLY1 | WWM | REVIEW | Passed | SEE ACTIVITY T11CM02309 FOR M,P,E IN THIS VAULT |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
08/17/2011 | GERARDO BONILLA | OUT TO CUSTOMER | Completed |
08/17/2011 | SUE REEVES | REJECT SHELF | Completed |