Permit Number: T11CM02410
Parcel: 13507451C

Review Status: Completed

Review Details: RESUBMITTAL

Permit Number - T11CM02410
Review Name: RESUBMITTAL
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
10/04/2011 JASON GREEN ENGINEERING REVIEW Denied DATE: October 4, 2011
REVIEWER: Jason Green, CFM
ACTIVITY: T11CM02410 (Building Plan)

SUMMARY: Engineering Division of Planning & Development Services Department has received the building plan (T11CM02410). Engineering Division does not recommend approval of the building plan applications at this time. The following items need to be addressed:


BUILDING PLAN COMMENTS:

1) Engineering could not verify that the building plan was in compliance with a stamped approved Development Plan Package (D11-0031). Please submit a copy of the stamped approved Development Plan, landscape, and NPPO plans with the next building plan submittal.

2) Engineering will re-review the building plan on the next submittal to insure compliance with the approved and stamped Development Plan. Additional comments may be forthcoming.


GENERAL COMMENTS:

Please provide the building plan with a copy of the last approved Development Plan (D11-0031). Further comments may be generated upon resubmittal of the building plan review.

For questions or to schedule an appointment I can be reached at 837-4929.




Jason Green, CFM
Senior Engineer Associate
Engineering Division
Planning & Development Services
10/12/2011 RONALD BROWN BUILDING-COMMERCIAL REVIEW Approved
10/18/2011 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Denied 1. Revise the overflow protection for the collector boxes serving the new scuppers. The overflow protection for the collector boxes must be capable of the passing the same flow as the primary scuppers. Reference: Sections 1101, 1106 and 1107, IPC 2006 and Section 1611.1, IBC 2006.
2. Clarify the configuration of the rainwater conductors connected to the roof drains and overflow drains located between columns M and P along column line 2B (sheet P1.0). Reference: Sections 106.3.1 and 1106.1, IPC 2006.
10/19/2011 STEVE SHIELDS ZONING REVIEW Denied PDSD TRANSMITTAL

FROM: Steve Shields
Lead Planner

PROJECT: B/E Aerospace
T11CM02410
Building Plan (2nd Review)

TRANSMITTAL DATE: October 19, 2011


1. The building, plan has been reviewed by Zoning Review Section but cannot approve the plans until all zoning comments or concerns have been addressed.

2. Zoning can not approve the plans until the development package has been approved..

3. Zoning will re-review the plans on the next submittal to insure compliance with the approved and development package. Additional comments may be forthcoming.

If you have any questions about this transmittal, please contact me at Steve.Shields@tucsonaz.gov or (520) 837-4956

C:\planning\building\t11cm02410.doc

RESUBMITTAL OF THE FOLLOWING IS REQUIRED:

Final Status

Task End Date Reviewer's Name Type of Review Description
10/20/2011 DELMA ROBEY OUT TO CUSTOMER Completed
10/20/2011 SUE REEVES REJECT SHELF Completed