Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - NEW
Permit Number - T11CM02410
Review Name: COMMERCIAL - NEW
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
08/29/2011 | DAVE MANN | FIRE | REVIEW | Approved | |
08/29/2011 | GERRY KOZIOL | WWM | REVIEW | Passed | |
08/31/2011 | JASON GREEN | ENGINEERING | REVIEW | Denied | Building Plan can not be approved until an approved Development Plan is submitted. DP D11-0016 was submitted for a small office addition and has yet to be approved. This building permit is proposing additional square footage to the existing building and is not shown on any last approved plan. Verify that the new addition is shown on an approved development plan and all aspect of DS Sec.2-05 (or 2-01 DP Package) is provided for a thorough review. This project should be full code compliant per the LUC and DS |
09/09/2011 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Denied | 1. Revise the roof drainage calculations for the scuppers. Scuppers are weirs and their width is the critical factor, not their area. Note that not all of the new roof areas are the same. Reference: Sections 1106 and 1107, IPC 2006. 2. Provide overflow protection for the new roof or provide structural calculations to show that the roof is capable of supporting the additional rain load caused by blocking the primary roof drainage. Reference: Sections 1101, 1106 and 1107, IPC 2006 and Section 1611.1, IBC 2006. |
09/09/2011 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Approved | |
09/09/2011 | ROBERT SHERRY | WATER | REVIEW | Approved | |
09/09/2011 | RONALD BROWN | BUILDING-COMMERCIAL | REVIEW | Denied | SHEET A8.0 1. At detail 1: add handrail on wall at both ramps and stairs. 2. At details 4 and 5: show handrails. 3. At details 3 and 7: add a horizontal rail 4" above walkway as required by ICC/ANSI 117.1, Section 405.9 and 505.10.1. SHEET S3.1 4. Detail 307: the calcs, page 28, call for 5#5s e.w. where as the detail shows 4#5 continuous. Please clarify. 5. Detail 309: the calcs call for 6#5s e.w. where as the detail shows 4#5 continuous. Please clarify. END OF REVIEW |
09/20/2011 | LEERAY HANLY | ELECTRICAL-COMMERCIAL | REVIEW | Approved | REVIEWED BY DAN SANTA-CRUZ |
09/23/2011 | TERRY STEVENS | ZONING | REVIEW | Denied | 09/23/2011 Development Services Department Zoning Review Section Terry Stevens Lead Planner Comments: 1. The building plan has been reviewed by Zoning Review Section but cannot approve the plan until it has been approved by the Engineering, and Landscape Review Sections and until all zoning comments or concerns have been addressed. 2. Zoning could not verify that the building plan was in compliance with the approved development plan. Please submit two copies of the approved and stamped development, landscape, and NPPO plans with the next building plan submittal. 3. Zoning will re-review the building plan on the next submittal to insure compliance with the approved site/development plan. Additional comments may be forthcoming. |