Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: RESUBMITTAL
Permit Number - T11CM02367
Review Name: RESUBMITTAL
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
08/19/2011 | LEERAY HANLY | ELECTRICAL-COMMERCIAL | REVIEW | Denied | 1. The electrical plans are to be sealed by an EE. COMMENT RESOLVED THE ARIZONA TECHNICAL BOARD OF REGISTRATION ALLOWS AN ENGINEER TO SEAL PLANS OUTSIDE OF HIS REGISTERED FIELD IF HE HAS SUFFICIENT TRAINING AND KNOWLEDGE. 2. Sheet E3.1, shows motors to be relocated and re-fed,show panel and circuit numbers. CORRECTIONS NON-RESPONSIVE TO ORIGINAL COMMENT WHERE ARE THESE PANELS? PROVIDE PANEL SCHEDULES AND LOAD CALCULATIONS FOR THESE PANELS. 3. Sheet E3.2. indicate panel and circuit numbers for fixtures, drastic relocation. CORRECTIONS NON-RESPONSIVE. TELLING US THERE ARE 4 CIRCUITS AVAILABLE IS NOT THE SAME AS IDENTIFYING THE CIRCUITS TO BE USED FOR LIGHTING. PROVIDE PANEL SCHEDULES AND LOAD CALCLULATIONS FOR THE PANELS USED. 4. Sheet E6.1, where is Panel EPP1 located and what effect will it have on existing load , (feeds new pnl DP-VDC), show conductors and conduit sizes. COMMENT NOT RESOLVED. NO REVISED SHEET E6.1 HAS BEEN SUBMITTED. WE WILL REQUIRE PANEL SCHEDULES AND LOAD CALCULATIONS. 5. Sheet IT E1.2, indicate what circuit the lights are to be added to and if circuit is sufficient for total load. COMMENT NOT RESOLVED. WHAT IS EXISTING CIRCUIT? WHAT ELSE IS ON EXISTING CIRCUIT? LPROVIDE PANEL SCHEDULES AND LOAD CALCULATIONS. |
08/19/2011 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Approved | |
08/19/2011 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Denied | Comment not resolved; the drain for an ice maker requires an indirect waste to a receptor using an air gap. Show how this will be accomplished. Reference: Section 801.2, UPC 2006. [Original comment: Clarify and provide a design for the plumbing described in keynote 15, sheet A3.1, "Provide water supply and compensate drain connection through millwork." Reference: Section 103.2.3, UPC 2006.] |