Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: REVISION - - 1ST
Permit Number - T11CM02343
Review Name: REVISION - - 1ST
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
12/12/2011 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Denied | 1. SHEET A7.0; KEYNOTES: KEYNOTE 13 ON CLEAN ROOM SECTION 4 IS INCORRECTLY SHOWN. REVISE. 2. SHEET A7.0; KEYNOTES: PROVIDE KEYNOTE 13 ON THE APPROPRIATE SECTION. 3. SHEET A7.0 (CLEAN ROOM SECTION 4); SHEET S2.2 (CEILING FRAMING PLAN): THE ARCHITECTURAL SECTION INDICATES A 1/4"/1' CEILING SLOPE, WHILE THE STRUCTURAL PLAN DOES NOT INDICATE THAT SLOPE. COORDINATE. 4. GENERAL: AN UNVENTED ATTIC SPACE HAS BEEN CREATED BY THE CLEAN ROOM ADDITION. REVISE PER THE 2006 IBC SECTION 1203 AND PROVIDE ACCESS PER THE 2006 IBC.. 5. GENERAL: PROVIDE WRITTEN RESPONSES TO ALL COMMENTS. |
12/12/2011 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Denied | 1. Clarify the sequence of operation for AC-2 and AC-3. A balancing note on detail 1/M1.1 implies that the units may operate either singly or in tandem but the ventilation for the space requires both units to be operating. 2. Coordinate the design of the top of the plenum with the architect. On sheet A7.0 the top of the plenum is pitched at 1/4 per foot down from column G to column J. |
12/12/2011 | RAY MAJUTA | ELECTRICAL-COMMERCIAL | REVIEW | Approved |