Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - TI
Permit Number - T11CM01992
Review Name: COMMERCIAL - TI
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 06/27/2011 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Denied | 1. SHEET S1.1 (FOUNDATION PLAN); STRUCTURAL CALCULATIONS (SHEET 9); SHEET A3.1 (DETAIL 5): THE NEW WALL FOOTING IN THE N.E. CORNER SHOWS 1'-4" WIDE IN THE CALCS, 2'-0" WIDE ON SHEET S1.1, 1'-4" ON DETAIL 4/A3.1, AND 12" ON DETAIL 5. CLARIFY. 2. ADD STRUCTURAL MATERIAL NOTES FOR CONCRETE, STRUCTURAL STEEL, WELDING, REINFORCING, GLU LAMS, BOLTS, ETC. 3. ADD STRUCTURAL NOTES FOR LOADINGS (WIND, SEISMIC, ETC.) AND SOIL BEARING. |
| 06/27/2011 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Passed | |
| 06/27/2011 | RAY MAJUTA | ELECTRICAL-COMMERCIAL | REVIEW | Passed | |
| 06/27/2011 | ROBERT SHERRY | WATER | REVIEW | Approved | |
| 06/27/2011 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Denied | Provide roof drainage calculations and plans. Include the contribution of the enclosing parapets and the tower roof. Reference: Sections 1101.11 and 1106.0, UPC 2006. |
| 06/27/2011 | RSHERRY1 | WWM | REVIEW | Passed | No new plumbing fixtures, |
| 06/27/2011 | JASON GREEN | ENGINEERING | REVIEW | Approved | |
| 11/07/2011 | GBONILL1 | ZONING | REVIEW | Needs Review | |
| 11/07/2011 | GBONILL1 | FIRE | REVIEW | Needs Review |