Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Number: T11CM01968
Parcel: 14022002A

Address:
1725 E BILBY RD

Review Status: Completed

Review Details: COMMERCIAL - TI

Permit Number - T11CM01968
Review Name: COMMERCIAL - TI
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
06/23/2011 ROBERT SHERRY MECHANICAL-COMMERCIAL REVIEW Approved
06/23/2011 ROBERT SHERRY WATER REVIEW Approved
06/27/2011 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Denied 1. Verify the developed natural gas pipe lengths noted for AC-19, AC-20, AC-22, and AC-23. Reference: Sections 106.3.1 and 402.3, IFGC 2006.
2. Provide cleanouts located not more than 100 feet apart and sized for the pipe they serve. Reference: Sections 708.3 and 708.7, IPC 2006.
06/28/2011 LOREN MAKUS ENGINEERING REVIEW Approved
06/28/2011 ERIC NEWCOMB BUILDING-COMMERCIAL REVIEW Denied 1. SHEET g1.0; INDEX: SHEET g1.3 IS IDENTIFIED AS "CODE ANALYSIS WEST BUILDING", AND SHEET g1.4 IS IDENTIFIED AS "CODE ANALYSIS EAST BUILDING". REVISE.
2. SHEET g1.3 (PLUMBING FIXTURES TABLE); SHEET g1.4 (CODE ANALYSIS): THE OCCUPANCY LOAD ON g1.3 IS LISTED AS 860 OCCUPANTS (PLUMBING FIXTURE COUNT IS BASED ON THIS FIGURE), WHILE THE OCCUPANCY LOAD ON g1.4 IS LISTED AS 1180. CLARIFY AND REVISE THE PLUMBING FIXTURE COUNTS AS REQUIRED.
3. SHEET s1.0; STRUCTURAL NOTES: IS THERE MASONRY ON THIS PROJECT? REMOVE IF NOT REQUIRED.
4. SHEET s1.0; STRUCTURAL NOTES: EXCEPT FOR THE STRUCTURAL STEEL TUBE COLUMNS, IS THERE OTHER STRUCTURAL STEEL ON THIS PROJECT? REMOVE IF NOT REQUIRED.
5. SHEET s2.0 (FOUNDATION PLAN); STRUCTURAL CALCULATIONS (SHEET 49): THE CALCULATIONS INDICATE DSW2 HAS 228.19 LB./FT. SHEAR, WHILE THE PLAN INDICATES IT IS A SW1 (155 LB./FT. CAPACITY). CLARIFY.
6. SHEET s2.0 (FOUNDATION PLAN); STRUCTURAL CALCULATIONS (SHEET 50): THE CALCULATIONS INDICATE DSW3 HAS 175.41 LB./FT. SHEAR, WHILE THE PLAN INDICATES IT IS A SW1 (155 LB./FT. CAPACITY)/ CLARIFY.
7. SHEET s2.0 (FOUNDATION PLAN); STRUCTURAL CALCULATIONS (SHEET 31): THE CALCULATIONS SHOW 6361 LB. OF SHEAR TO BE RESISTED BY A SHEAR WALL (INDICATED AS SW3 ON THE PLAN), BUT THERE IS NO WALL DESIGNATION ON THE KEY PLAN. IS THIS DSW4? VERIFY.
8. SHEET s2.0 (FOUNDATION PLAN); STRUCTURAL CALCULATIONS (SHEET 31): THE CALCULATIONS SHOW 5323 LB. OF SHEAR TO BE RESISTED BY A SHEAR WALL (INDICATED AS SW2 ON THE PLAN), BUT THERE IS NO WALL DESIGNATION ON THE KEY PLAN. IS THIS DSW5? VERIFY.
9. SHEET x1.2; DETAIL 5: REVISE THE DETAIL REFERENCE FOR THE SCOUR PAD.
10. SHEETS a5.0, a6.0, a6.1, AND a6.2 (KEY NOTE 3.4); SHEETS s2.0 AND s2.1 (FOUNDATION NOTE 2): THE ARCHITECTURAL NOTE INDICATES THE CONCRETE BUILDING SLAB IS 5" THICK, WHILE THE STRUCTURAL NOTE INDICATES 4". CLARIFY.
11. SHEET a7.1; ELEVATION 9: PROVIDE THE HEIGHT OF THE COUNTER FOR THE ACCESSIBLE SINK PER THE IBC SECTION 1109.3.
12. GENERAL: ALL DEFERRED SUBMITTALS MUST BE APPROVED IN WRITING BY RON BOOSE OR LEERAY HANLY BEFORE THOSE SUBMITTALS WILL BE REVIEWED.
13. GENERAL: PROVIDE WRITTEN RESPONSES TO ALL REVIEW COMMENTS.
06/28/2011 GERRY KOZIOL WWM REVIEW Denied 1. HIGH SCHOOL - " NEW BUILDING SPACE" NO DEMO - WITHIN NEW ASSUMED PROPERTY LINES PER SITE ANALYSIS G1.3

2. CONNECTING TO EXISTING 8" PUBLIC SEWER WITH A 4" ON SITE PRIVATE SEWER

3. NEED COPY OF RICK ENGINEERING DRAWING "C3" FOR 4" ON-SITE PRIVATE SEWER FOR BASE MAP UPDATE - (IF OVER 3000 GL / DAY NEED DEQ REVIEW & APPROVAL TO CONSTRUCT)

4. NEED 3RD FLOOR PCRQRD REVIEW & APPROVAL OF CAPACITY - CHAD AMATEAU 740-6547

5. NEED IWC/ REVIEW & APPROVAL OF ACID NEUTRALIZATION TANK FRO SCIENCE ROOM LABS - TOM TOMCHAK - 443-6200 - 5025 W. INA RD
06/28/2011 RAY MAJUTA ELECTRICAL-COMMERCIAL REVIEW Approved
06/28/2011 DAVE MANN FIRE REVIEW Denied Fire Comments:

Sheets G1.4 and A8.0.
Doors 110, 111, 109 etc. from rooms used for over 50 occupants for educational puroses are required to have panic hardware. See IFC 1008.1.9.