Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - TI
Permit Number - T11CM01705
Review Name: COMMERCIAL - TI
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
06/14/2011 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Denied | 1. Coordinate the plumbing schedule entry and the fixture specification for the floor sink, P-1. Clarify why the 3" waste pipe for P-1 has a 4" vent. Reference: Section 103.2.3, UPC 2006. 2. Indicate the materials to be used in the proposed plumbing systems for this activity. Reference: Sections 103.2.3, 301.1, 604.0, 701.0, 903.0, and 1209.5, UPC 2006. (Note: ABS building sewers over 60 feet long with slopes less than ΒΌ" per foot require special inspection for slope.) 3. Specify the freeze protection for the water supply piping to the hose bibbs and to the cooling towers. Reference: Section 313.6, UPC 2006. 4. Provide cleanouts in the building sewer at intervals not exceeding 100 feet. Reference: Section 719.1, UPC 2006. |
06/14/2011 | ROBERT SHERRY | WATER | REVIEW | Approved | |
06/14/2011 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Denied | 1. Revise the font size used on the drawings to a minimum height of 3/32-inch. Reference: Section 106.1.1, IBC 2006. 2. Specify the insulation to be used for the chilled water and heating water piping on this project. Reference: Section 503.2.8, IECC 2006. 3. Specify the minimum resistance (R-value) of the duct insulation to be used on this project. Reference: Section 503.2.7, IECC 2006, as amended by the City of Tucson. 4. Provide a design for the condensate dry wells. Reference: Section 307.2.1, IMC 2006, as amended by the City of Tucson. 5. Provide calculations to show that the specified machinery room ventilation system complies with Section 1105, IMC 2006. |
06/20/2011 | GERRY KOZIOL | WWM | REVIEW | Approved | |
06/22/2011 | STEVE SHIELDS | ZONING | REVIEW | Denied | DSD TRANSMITTAL FROM: Steve Shields Lead Planner PROJECT: SouthWest Gas - Mechanical Building T11CM01705 Building Plan (1st Review) TRANSMITTAL DATE: June 22, 2011 1. The building plan has been reviewed by Zoning Review Section but cannot approve the plan until all zoning comments or concerns have been addressed. 2. Zoning can not approve the building plan until a revised development plan has been approved. 3. Zoning will re-review the building plan on the next submittal to insure compliance with the approved and stamped development plan. Additional comments may be forthcoming. If you have any questions about this transmittal, please contact me at Steve.Shields@tucsonaz.gov or (520) 837-4956 C:\planning\grading\t11cm01705.doc |
06/28/2011 | PAUL MACHADO | ENGINEERING | REVIEW | Approved | |
06/29/2011 | RAY MAJUTA | ELECTRICAL-COMMERCIAL | REVIEW | Approved |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
07/12/2011 | DELMA ROBEY | OUT TO CUSTOMER | Completed |