Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Number: T11CM01550
Parcel: 13507451C

Review Status: Completed

Review Details: COMMERCIAL - TI

Permit Number - T11CM01550
Review Name: COMMERCIAL - TI
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
05/24/2011 DAVE MANN FIRE REVIEW Denied Fire Comments:

Sheet A9.0
Stair run must be at least 11 inches per IFC Section 1009.3.
05/24/2011 LEERAY HANLY MECHANICAL-COMMERCIAL REVIEW Passed
05/24/2011 LEERAY HANLY ELECTRICAL-COMMERCIAL REVIEW Approved
05/24/2011 LHANLY1 WATER REVIEW Passed
05/24/2011 LEERAY HANLY BUILDING-COMMERCIAL REVIEW Denied 1) PLEASE MODIFY GENERAL BUILDING SUMMARY PP A0.0 TO SHOW UNLIMITED AREA ALLOWED FOR 2 STORY SHELL (IBC 507.4). THIS WILL ELIMINATE ANY CONFUSION IN THE FUTURE AS TO WHETHER SHELL AREA SHOULD BE SEPARATED FROM EXISTING.

2) PP A-2.1 PARTION TYPES INDICATE 20 GAUGE STUDS, PLEASE COORDINATE WITH STRUCTURAL REQUIREMENTS OF 18 GAUGE STUDS.

3) PP A-4.0 SCUPPER WIDTHS DO NOT MEET MINIMUM REQUIREMENTS FOR ROOF DRAINAGE PER IPC

4) PP A5-0 DETAIL REFERENCE FOR SHIP LADDER AT EAST ELEVATION LEFT AS X/X (SHOULD READ 2/A4.0)

5) PLEASE PROVIDE DIMENSIONS AND CONNECTION DETAILS FOR SOLAR SHADING DEVICES INDICATED ON PLANS

6) PP A-9.0 DETAILS 11 & 12; GUARDS COMPLYING WITH IBC SECTION 1013 REQUIRED AT SOUTH-EAST STAIR.

7) PP A9.0 DETAIL 12; TREAD DEPTH DETAILED AS 10", OTHER SHEETS AND CODE REQUIRE 11".

8) GEO TECH REPORT INDICATES OVER-EXCAVATION IS REQUIRED AT FOUNDATIONS AND ISOLATED FOOTINGS. PLEASE ADD MINIMUM OVER-EX DIMENSIONS TO FOUNDATION PAGE PP S1.1.

9) ON RESUBMITTAL PLEASE ATTACH A DEFERRED SUBMITTAL REQUEST FOR STAIRS AND I-JOISTS MADE OUT THE CITY OF TUCSON BUILDING OFFICIAL "RON BOOSE".

10) SPECIAL INSPECTION SHALL BE REQUIRED FOR CONCRETE TESTING AND FOR SOILS. PLEASE ADD CATETGORY AND INSPECTOR CANDIDATE TO SPECIAL INSPECTION CERTIFICATE.
05/24/2011 JASON GREEN ENGINEERING REVIEW Approv-Cond Building plan set will be stamped approved based on the approval of the Development Plan Set.
05/24/2011 LEERAY HANLY PLUMBING-COMMERCIAL REVIEW Denied 1) ROOF SCUPPERS PP A-4.O DO NOT COMPLY WITH IPC 1107.3. PLEASE PROVIDE HYDRAULIC CALCULATIONS FOR ROOF DRAINAGE THROUGH A WEIR, OR ALTERNATIVELY PROVIDE DATA SHOWING COMPLIANCE WITH IPC SECTION 1110.

2) PLEASE PROVIDE INFORMATION VERIFYING EXISTING ROOF DRAINAGE OF SINGLE STORY BUILDING CAN HANDLE ADDITONAL DRAINGE FROM NEW SHELL, AS WELL AS ADDITIONAL DRAINAGE PER IPC 1106.4
05/25/2011 GERRY KOZIOL WWM REVIEW Approved
06/03/2011 CPIERCE1 ZONING REVIEW Needs Review