Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - NEW
Permit Number - T11CM01448
Review Name: COMMERCIAL - NEW
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
05/20/2011 | DAVE MANN | FIRE | REVIEW | Approved | |
05/26/2011 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Denied | 1. SHEET S-001; GENERAL NOTES: NOTE 2 INDICATES A GEOTECHNICAL REPORT WAS USED ON THIS PROJECT. PROVIDE THAT REPORT FOR REVIEW. 2. SHEET S-100; COLUMN SCHEDULE: PROVIDE BASE PLATES AND ANCHOR BOLTS FOR ALL COLUMNS IN THE SCHEDULE. 3. SHEET S-200; FOUNDATION NOTES: ADD A REFERENCE TO SHEET S-501 FOR THE TYPICAL GRADE BEAM SCHEDULE AND THE BAR PLACEMENT DETAIL. 4. SHEET S-200; FOUNDATION PLAN: COMPLETE THE DETAIL CUT IN THE SW CORNER OF THE PLAN. 5. SHEET S-200 (FOUNDATION PLAN); SHEET S-500 (DETAIL 11): THE DETAIL INDICATES TO REFERENCE THE PLAN FOR THE GRADE BEAM ON GRID A.0, BUT THE PLAN DOES NOT INDICATE A GRADE BEAM. CLARIFY. 6. SHEET S-200 (FOUNDATION PLAN); SHEET S-500 (DETAIL 4): THE DETAIL INDICATES A CONTINUOUS WALL FOOTING, WHILE THE PLAN INDICATES A GRADE BEAM (GB-6 AND GB-7). CLARIFY. 7. SHEET S-200; FOUNDATION PLAN: A PLAN NOTE NEAR GRIDS 5 AND A INDICATES TO STEP THE BOTTOM OF THE GRADE BEAM. PROVIDE A DETAIL FOR THIS CONDITION. 8. SHEET S-200; FOUNDATION PLAN: A PLAN NOTE NEAR GRIDS 7 AND B INDICATES 4" HOUSEKEEPING PADS PER ELECTRICAL. DO THESE PADS REQUIRE REINFORCING OR DOWELS INTO THE FLOOR SLAB? CLARIFY AND ADD NOTES OR DETAILS AS REQUIRED. 9. SHEET S-201; FOUNDATION PLAN: PROVIDE DETAILS WHERE NEW CONSTRUCTION ABUTS OR USES EXISTING FOUNDATIONS (GRADE BEAMS, SLABS, COLUMNS, FOOTINGS, ETC.). 10. SHEET S-201 (FOUNDATION PLAN); SHEET S-500 (DETAILS 5 AND 7): THE DIMENSION FROM THE FACE OF THE GRADE BEAM TO THE GRID LINE VARIES BETWEEN THESE TWO DETAILS. CLARIFY. 11. SHEET S-201; FOUNDATION PLAN: PROVIDE DETAIL CUTS ON THIS PLAN USED ON SHEET S-200, AND PROVIDE NEW DETAIL CUTS AS REQUIRED. 12. SHEET S-201; FOUNDATION PLAN: THE COLUMN AT GRIDS 5 AND K.8 HAS NO BOTTOM OF DRILLED SHAFT NOTED. VERIFY. 13. SHEET S-201; FOUNDATION PLAN: THE COLUMN AT GRIDS 2.8 AND K.3 HAS NO BOTTOM OF DRILLED SHAFT NOTED. VERIFY. 14. SHEET S-202; FOUNDATION PLAN: PROVIDE DETAILS AND VERBIAGE AS REQUIRED AT THE NEW CONSTRUCTION ABOVE GRID 8. 15. SHEET S-202; FOUNDATION PLAN: REVISE THE DETAIL CUT ON GRID 8. 16. SHEET S-202; FOUNDATION PLAN: REMOVE THE DRILLED SHAFT INFORMATION AT GRID J. 17. SHEET S-500; DETAIL 13: THE 8" CONCRETE WALL INDICATES #4 AT 12" OC EW, EF. ARE THERE REINFORCING BARS IN EACH FACE? VERIFY. 18. SHEET S-500; DETAIL 2: ADD REFERENCES TO SHEET S-501 FOR THE PIER NOTE AND THE DRILLED SHAFT SCHEDULE. 19. SHEET S-500; DETAIL 1: ADD A REFERENCE TO SHEET S-501 FOR THE DRILLED SHAFT SCHEDULE. 20. SHEET S-500; DETAILS 5 THROUGH 12 AND 16: ADD A REFERENCE TO SHEET S-501 FOR THE TYPICAL GRADE BEAM SCHEDULE AND THE BAR PLACEMENT DETAIL. 21. SHEET S=501; GRADE BEAM SCHEDULE: THE CITY OF TUCSON REQUIRES ALL LETTERING TO BE A MINIMUM OF 3/32" IN HEIGHT (UPPER AND LOWER CASE). REVISE THE SCHEDULE TO MEET THAT CRITERIA. 22. STRUCTURAL CALCULATIONS; DRILLED SHAFTS GRAVITY (SECTION 4): IT IS NOT CLEAR ON THE LAST 3 SHEETS OF THIS SECTION HOW THE PIER SIZES DENOTED ARE MATCHED TO THE COLUMN LOADS INDICATED IN THE CALCULATIONS (SECTIONS 2 AND 3). CLARIFY BY ADDING COLUMN NOTATIONS (GRID COORDINATES OR COLUMN NUMBERS) TO THESE 3 SHEETS AND GIVE A SUMMARY. 23. GENERAL: PROVIDE WRITTEN RESPONSES TO ALL REVIEW COMMENTS. |
06/07/2011 | LEERAY HANLY | PLUMBING-COMMERCIAL | REVIEW | Approved | |
06/07/2011 | LEERAY HANLY | ELECTRICAL-COMMERCIAL | REVIEW | Passed | |
06/07/2011 | GERRY KOZIOL | WWM | REVIEW | Denied | NEED TO SHOW LOCATION/METHOD OF CONNECTION TO PUBLIC SEWER. NEED CIVAL DRAWINGS SHOWING REMOVAL OF SEWER ITEMS BEYOND 5 FEET FROM BUILDING FOOTPRINT. NEED 3RD FL CAPACITY REVIEW 7 APPROVAL- PCRWRD/3RD FL - 740-6305- MIKE HARRINGTON |
06/07/2011 | LEERAY HANLY | MECHANICAL-COMMERCIAL | REVIEW | Passed | |
06/07/2011 | LHANLY1 | WATER | REVIEW | Passed | |
06/08/2011 | DAVID RIVERA | ZONING | REVIEW | Denied | Zoning cannot approve the foundation plan until the development has been approved and a copy of the CDRC approved development plan is included with the building plans set on the next submittal. |
06/20/2011 | ELIZABETH LEIBOLD | ENGINEERING | REVIEW | Denied | Address plumbing comments regarding new 1-in PVC sanitary sewerline. Provide documentation / details for inlet and outlet of new storm sewerline on sheet P-101. |