Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - TI
Permit Number - T11CM01447
Review Name: COMMERCIAL - TI
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 05/12/2011 | BETH GRANT | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Passed | |
| 05/12/2011 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Approved | |
| 05/12/2011 | ERIC NEWCOMB | ADA | REVIEW | Passed | |
| 05/12/2011 | ROBERT SHERRY | WATER | REVIEW | Approved | |
| 05/12/2011 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Approved | |
| 05/18/2011 | PAUL MACHADO | ENGINEERING | REVIEW | Approved | |
| 05/18/2011 | MICHAEL ST. PAUL | ZONING | REVIEW | Approved | |
| 05/18/2011 | RONALD BROWN | BUILDING-COMMERCIAL | REVIEW | Approved | |
| 05/18/2011 | DAVE MANN | FIRE | REVIEW | Approved | |
| 05/19/2011 | RAY MAJUTA | ELECTRICAL-COMMERCIAL | REVIEW | Approved | T11CM01447 4995 E Speedway Goodwill TI Electrical Plans denied for the following: 1. Sump on E-1 shown on circuit K-4, should be K-14. 2. Circuits K 6 and 8 not shown on plan, only in s panel schedule. 3. All meters are required to have and address or suite # for identification, these should also identify the panels.Please ID each meter, main disconnect,and panel the same. Check with addressing to corolate. 4. General note 2 on the one line diagram notes the following:'' Inspect all existing conductors, terminations and service equipment for signs of deterioation,code issues damages or overloading. Photograph and submit written report to Engineer and Architect of record prior to commencement of work". This is work that is required to be taken care of prior to submiting for a permit. The wotk entailed in this plan notes replacement of the 800 amp CT enclosure, meters, reusing main disconnects with switches suitable if switches have fuses that protect down stream at levels of 10,000 amp fault current or below. All of these issues are to be reviewed on site prior to obtaining a permit. Provide all information on the one line diagram including the service entrance conductors, the size of the gutters on the side of the CT enclosure, the conductors going to the gutters , the existing grounding system etc. In using the word optional to describe certain installations charges for fees are made to both on the permit fees,please consider this when including aoptional installation. Ray T Majuta, Elect Plan Ck, PDSD, City of Tucson , 5/19/11 Ray.majuta@tucsonaz.gov |
| 05/26/2011 | GERRY KOZIOL | WWM | REVIEW | Approved |