Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - TI
Permit Number - T11CM01364
Review Name: COMMERCIAL - TI
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
05/06/2011 | MARTIN BROWN | FIRE | REVIEW | Approv-Cond | Permanently locked back door must comply with 2006 IFC, Section 504.2. |
05/11/2011 | GERRY KOZIOL | WWM | REVIEW | Approved | |
05/13/2011 | RAY MAJUTA | ELECTRICAL-COMMERCIAL | REVIEW | Approved | |
06/01/2011 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Denied | 1. Provide a design for the mounting shelf for the water heater along with structural calculations to show that the water heater is safely supported. Reference: Sections 310.0 and 314.5, UPC 2006. 2. Show how the temperature of the hot water supply to the public lavatory is controlled. Reference: Section 413.1, UPC 2006 and Section 504.3, IECC 2006. 3. No more than one trap shall be installed on a trap arm; the specified solids interceptor (Zurn Z1180) is installed in lieu of the standard P-trap for a sink. (Note also that the specified solids interceptor requires 10-3/16" of clearance above the interceptor for maintenance, contrary to the note in the fixture schedule and on sheet P1.2.) Reference: Section 1001.1, UPC 2006. 4. Clarify the legend shown on sheet P1.3 which calls for water (DCW) to be supplied to each chair; no water piping is shown being supplied to any chair. 5. Clarify the proposed use for the vacuum being supplied to the medical gas boxes (MGB); is it for equipment use or surgical use? 6. Copper medical gas piping shall be hard-drawn, Type L (or Type K if over 185 PSIG); the minimum size pipe allowed in medical gas systems is ½" diameter (nominal). Reference: Section 1316.3, UPC 2006. |
06/02/2011 | ROBERT SHERRY | WATER | REVIEW | Approved | |
06/02/2011 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Denied | 1. Revise the design of the ventilation of the medical gas room to comply with the requirements of Section 502.9.1, IMC 2006 with respect to mechanical ventilation and to the enclosure of the exhaust and intake duct shafts. (Also, clarify why keynote #6 is shown by exhaust fans EF-1 and EF-2.) 2. Show the route and termination of the condensate drain for the new packaged heat pump. Key note #2 on sheet P1.2 refers to a ¾" condensate drain pipe terminating over a floor sink but neither the key note nor the condensate drain are shown on the plumbing plan. |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
06/15/2011 | DELMA ROBEY | OUT TO CUSTOMER | Completed |
06/15/2011 | SUE REEVES | REJECT SHELF | Completed |