Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Number: T11CM01364
Parcel: 13355230A

Review Status: Completed

Review Details: COMMERCIAL - TI

Permit Number - T11CM01364
Review Name: COMMERCIAL - TI
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
05/06/2011 MARTIN BROWN FIRE REVIEW Approv-Cond Permanently locked back door must comply with 2006 IFC, Section 504.2.
05/11/2011 GERRY KOZIOL WWM REVIEW Approved
05/13/2011 RAY MAJUTA ELECTRICAL-COMMERCIAL REVIEW Approved
06/01/2011 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Denied 1. Provide a design for the mounting shelf for the water heater along with structural calculations to show that the water heater is safely supported. Reference: Sections 310.0 and 314.5, UPC 2006.
2. Show how the temperature of the hot water supply to the public lavatory is controlled. Reference: Section 413.1, UPC 2006 and Section 504.3, IECC 2006.
3. No more than one trap shall be installed on a trap arm; the specified solids interceptor (Zurn Z1180) is installed in lieu of the standard P-trap for a sink. (Note also that the specified solids interceptor requires 10-3/16" of clearance above the interceptor for maintenance, contrary to the note in the fixture schedule and on sheet P1.2.) Reference: Section 1001.1, UPC 2006.
4. Clarify the legend shown on sheet P1.3 which calls for water (DCW) to be supplied to each chair; no water piping is shown being supplied to any chair.
5. Clarify the proposed use for the vacuum being supplied to the medical gas boxes (MGB); is it for equipment use or surgical use?
6. Copper medical gas piping shall be hard-drawn, Type L (or Type K if over 185 PSIG); the minimum size pipe allowed in medical gas systems is ½" diameter (nominal). Reference: Section 1316.3, UPC 2006.
06/02/2011 ROBERT SHERRY WATER REVIEW Approved
06/02/2011 ROBERT SHERRY MECHANICAL-COMMERCIAL REVIEW Denied 1. Revise the design of the ventilation of the medical gas room to comply with the requirements of Section 502.9.1, IMC 2006 with respect to mechanical ventilation and to the enclosure of the exhaust and intake duct shafts. (Also, clarify why keynote #6 is shown by exhaust fans EF-1 and EF-2.)
2. Show the route and termination of the condensate drain for the new packaged heat pump. Key note #2 on sheet P1.2 refers to a ¾" condensate drain pipe terminating over a floor sink but neither the key note nor the condensate drain are shown on the plumbing plan.

Final Status

Task End Date Reviewer's Name Type of Review Description
06/15/2011 DELMA ROBEY OUT TO CUSTOMER Completed
06/15/2011 SUE REEVES REJECT SHELF Completed