Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - BLDG/FIRE/ZONING/ENG
Permit Number - T11CM01336
Review Name: COMMERCIAL - BLDG/FIRE/ZONING/ENG
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 05/04/2011 | DAVE MANN | FIRE | REVIEW | Denied | Please indicate on drawings exact location of ramada, with dimensions to nearest structure(s). |
| 05/04/2011 | RONALD BROWN | ADA | REVIEW | Passed | |
| 05/20/2011 | PAUL MACHADO | ENGINEERING | REVIEW | Denied | Cannot be approved prior to the approval of the Dev.Pkg., 05-20-2011, PM. |
| 05/20/2011 | RONALD BROWN | BUILDING-COMMERCIAL | REVIEW | Denied | 1. Please provide the last approved site development plan. a. Please provide a plan showing the layout and configuration of the Ramada. 2. As per you building data, this facility is classified in the 2006 IBC as a "U" for utility and is considered a public, commercial use. a. The accessibility toilet requirements will therefore be commercial and shall following the space guidelines as per ICC (ANSI 117.1), Section 603 and comply with water closet clearances as per 604.3, not as per dwelling units "A" or "B". Please revise both toilet rooms accordingly. 2. Please provide actual design toilet elevations with accessibility dimensions, accessories and fixtures as per ICC (ANSI 117.1). Code copied generic details are not acceptable. 3. For the purpose of assessing additional plan review fees, please provide a letter to the building official, Mr. Ron Bose, summarizing the items of deferred submittals; i.e. premanufactured wood trusses. 4. Please provide a roof framing and foundation key plan in the calculations. 5. Please schedule truss "A" on the drawings. 6. Please provide structural; calculations for the Ramada only. The other elements shown are not in this project submittal. END OF REVIEW |
| 05/31/2011 | BETH GRANT | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Passed | |
| 05/31/2011 | TERRY STEVENS | ZONING | REVIEW | Denied | 05/31/2011 Development Services Department Zoning Review Section Terry Stevens Lead Planner Comments: 1. The building plan has been reviewed by Zoning Review Section but cannot approve the plan until it has been approved by the Engineering, and Landscape Review Sections and until all zoning comments or concerns have been addressed. 2. Zoning could not verify that the building plan was in compliance with the approved development plan. Please submit two copies of the approved and stamped development, landscape, and NPPO plans with the next building plan submittal. 3. Zoning will re-review the building plan on the next submittal to insure compliance with the approved site/development plan. Additional comments may be forthcoming. |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 06/01/2011 | CPIERCE1 | OUT TO CUSTOMER | Completed |