Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - NEW
Permit Number - T11CM01274
Review Name: COMMERCIAL - NEW
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
04/29/2011 | RONALD BROWN | ADA | REVIEW | Passed | |
05/02/2011 | DAVE MANN | FIRE | REVIEW | Approved | |
05/03/2011 | GERRY KOZIOL | WWM | REVIEW | Approved | |
05/12/2011 | RONALD BROWN | BUILDING-COMMERCIAL | REVIEW | Denied | 1. For the purpose of assessing additional review fees, please submit to the building offical, in writing, a summary of all the deferred submittals intended for this project. Please include the prefabricated wood I joists. 2. Please provide a large scale toilet plan showing all required accessible dimensions, accessories and fixtures. 3. Please provide the hardware schedule on the plans as there are no project manuals for this project. 4. The following doors are non-compliant if they have both a closer and a latch. With no hardware schedule, there is no way of telling: 121, 122, 110, 109, 110A and 106. Reference ICC (ANSI 117.1), Section 404.2.3.1 Figure (b). 5. Door numbers 107 and 108 are non compliant as they do not have an 18" clearance on the pull side as required by Section 404.3.2.1, Figure (a). 6. Please provide structural calculations for the following: a. All roof top mounted HVAC equipment. b. Water heater support brackets and detail. 7. The foundation plan shown on sheet S2.0 and the foundation key plan shown in the calculation manual do not coincide; key plan is not complete and the foundations differ. 8. The calculations show DB1 and DB2 to be 5 1/8 x 18 whereas the drawing framing plan show both to be 6.75 x15. Please show calculations for the 6.75x15 glb. 9. On sheet TS1, Code Analysis, please delete the Arizona State Accessibility and replace with the 2006 IBC, Chapter 11 and ICC (ANSI 117.1, 2003 Edition) END OF REVIEW |
05/12/2011 | BETH GRANT | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Completed | |
05/19/2011 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Approved | |
05/19/2011 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Denied | Revise the roof scupper calculations to include the contributing roof and wall areas per Sections 1106.1 and 1106.4, IPC 2006. Determine the minimum scupper width using hydraulic calculations (a scupper acts as a weir) per Section 1107.3, IPC 2006. |
05/19/2011 | ROBERT SHERRY | WATER | REVIEW | Denied | Coordinate the size of the water meter serving this building (1" on P-3 compared to 1-1/4" on the architectural site plan) |
05/21/2011 | RAY MAJUTA | ELECTRICAL-COMMERCIAL | REVIEW | Approved |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
05/23/2011 | GERARDO BONILLA | OUT TO CUSTOMER | Completed |
05/23/2011 | SUE REEVES | REJECT SHELF | Completed |