Permit Number: T11CM01154
Parcel: 130140260

Address:
4144 E 22ND ST

Review Status: Completed

Review Details: COMMERCIAL - NEW

Permit Number - T11CM01154
Review Name: COMMERCIAL - NEW
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
04/21/2011 DAVE MANN FIRE REVIEW Approved
04/21/2011 GERRY KOZIOL WWM REVIEW Passed
05/02/2011 ERIC NEWCOMB BUILDING-COMMERCIAL REVIEW Denied 1. SHEET EC-1; NOT IN SCOPE OF WORK: NOTE 4 INDICATES FOOTINGS ARE NOT IN MADISON'S SCOPE OF WORK, WHILE THE CALCULATIONS INCLUDE THE FOOTING DESIGN. CLARIFY AND REVISE.
2. SHEET FC-1: PROVIDE NOTES FOR CONCRETE AND REINFORCING DESIGN STRENGTHS, OR REFERENCE ANOTHER SHEET FOR THIS INFORMATION.
3. SHEET FC-1: REFERENCE THE ALLOWABLE SOIL PRESSURES USED FOR DESIGN, AND INCLUDE THE GEOTECHNICAL INVESTIGATION REPORT NUMBER.
4. GENERAL: PROVIDE WRITTEN RESPONSES TO ALL REVIEW COMMENTS.
05/03/2011 ROBERT SHERRY WATER REVIEW Passed
05/03/2011 ROBERT SHERRY MECHANICAL-COMMERCIAL REVIEW Passed
05/04/2011 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Denied 1. The minimum opening height for a scupper is 4". Reference: Section 1101.11.2.1, UPC 2006.
2. Provide a cleanout at the base of each vertical roof drain leader prior to its connection with the horizontal storm drain. Reference: Section 1101.12.2, UPC 2006.
05/06/2011 RAY MAJUTA ELECTRICAL-COMMERCIAL REVIEW Approved
05/13/2011 TERRY STEVENS ZONING REVIEW Denied 05/13/2011

Development Services Department
Zoning Review Section

Terry Stevens
Lead Planner

Comments:

1. The building plan has been reviewed by Zoning Review Section but cannot approve the plan until it has been approved by the Engineering, and Landscape Review Sections and until all zoning comments or concerns have been addressed.

2. Zoning could not verify that the building plan was in compliance with the approved site plan. Please submit two copies of the approved and stamped site, landscape, and NPPO plans with the next building plan submittal.

3. Zoning will re-review the building plan on the next submittal to insure compliance with the approved site plan. Additional comments may be forthcoming.
05/17/2011 LAITH ALSHAMI ENGINEERING REVIEW Denied Laith Alshami, Engineering and Floodplain Review, 05/17/2011,

The building plan shall be approved after the approval of the Development Plan.

Final Status

Task End Date Reviewer's Name Type of Review Description
08/08/2011 CPIERCE1 OUT TO CUSTOMER Completed
08/08/2011 SUE REEVES REJECT SHELF Completed