Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - NEW
Permit Number - T11CM01094
Review Name: COMMERCIAL - NEW
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 04/14/2011 | ERIC NEWCOMB | ADA | REVIEW | Passed | |
| 04/19/2011 | GERRY KOZIOL | WWM | REVIEW | Denied | NEED ADDRESSING REVIEW NEED WW PLUMBING DEMO DRAWINGS FOR CREDIT IF APPLICABLE |
| 04/19/2011 | DAVE MANN | FIRE | REVIEW | Approved | |
| 04/25/2011 | RONALD BROWN | BUILDING-COMMERCIAL | REVIEW | Denied | GENERAL: 1. Please remove duplicative sheets within the sets. 2. Provide structural calculations for the following: a. All Roof top mounted Equipment. b. Wall mounted water heater. 3. Provide Special Inspection Certifications for those special inspections shown in the conditions section of this permit application. 4. If the LPI roof joists are to be a deferred submittal, please submit a deferred submittal letter to the building official for additions plan review fee assessment. SHEET TS1 5. Please provide a square footage analysis separating the new addition from the existing TI square footage. 6. Please provide a budget estimate strictly for the TI work. 7. Change Corridor protection: n/a to Corridor protection: Fully Sprinkled. 8. At the Applicable Codes summary: a. Change the ANSI 117 .1 1998 Edition to 2003 Edition. 9. Change the International Fire Code 2003 Edition to 2006 Edition. SHEET A1.0 10. Insure that the staff toilet is fully accessible. 11. The water dispenser called out on the architectural floor plan is not the same as specified in the plumbing equipment schedule. Please reconcile. a. Please insure that the specified water cooler is a dual height unit as required by the 2006 IBC, section 1109.5 and ICC (ANSI 117.1), Section 602.4. 12. Doors 116, 117, 118, 119, 120, 121, 122, 123, 125, 134, 127 and 129 are not accessible compliant. A front approach, pull side situation requires an 18" clearance at the strike as required by ANSI 117.1, Section 404.2.3.1 (a). 13. Doors 124 and 33, Required Exits: a. Provide panic hardware as per the 2006 IBC, Section 1008.1.9. b. Provide 12" clear on inside strike side as per Section 404.2.3.1(b). 14. I doors 105 and 108 have a latch and a closer, they also do not comply with Section 404.2.3.1(b) SHEET A6.0 15. DETAIL 1: a. Door through corridor requires an 18" clearance on front approach, pull side. b. Please show 5' diameter turn around space in both toilet rooms. c. Please show all required accessible dimensions. 16. Detail 2: This toilet room is required to be accessible. 17. Detail 3: Please show all accessible dimensions, accessories and clearance as required by code. 18. Elevation "G" is not compliant with Section 604.3. SHEET A7.0 19. Please provide a hardware schedule. SHEET AS1.0 20. The slopes at the bottom of the new ramp are not compliant with section 403.3 for an accessible route. 21. Please detail the ramps including all required handrails. END OF REVIEW |
| 04/26/2011 | BETH GRANT | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Completed | |
| 05/02/2011 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Denied | 1. Show how the new water piping relates to the existing water supply system and show that the additional connections do not cause the existing piping to be overloaded (note the excessive pressure drop across the existing water meter - 9 PSI). Reference: Section 101.5.1, UPC 2006. 2. Provide a design for the mounting shelf for the water heater along with structural calculations to show that the water heater is safely supported. Reference: Sections 310.0 and 314.5, UPC 2006. 3. Verify that the specified water closets require a minimum pressure of only 15-PSI; Typically the American Standard water closets require a minimum flowing pressure of 20 PSI. Reference: Section 608.1, UPC 2006. 4. Provide a vacuum relief for the storage-type water heater. Reference: Section 608.7, UPC 2006. 5. The submitted water pressure calculations do not support the size of water piping to the fixtures. Reference: Section 610.1, UPC 2006. 6. The branch piping sizes called out for the flush valves will result in water velocities greater than 8 FPS. Limit the water velocity to less than 8 FPS for the copper piping. Reference: Sections 610.12 and A 6.1, UPC 2006 and IS 3-2003, Section 2.6. 7. Provide calculations to support the scupper design or Revise the size of the provided scuppers to comply with the requirements of Section 1101.11.2.1, UPC 2006. Reference: Sections 1101.11.1 and 1101.11.2.1, UPC 2006. 8. The height of the overflow is 4" above the inlet to the primary roof drain; provide structural calculations to show that the roof can support the weight of water that will accumulate if the primary roof drain is blocked. Reference: Section 1101.11.2, UPC 2006 and Section 1611.1, IBC 2006. (Note that the specified model number for the Froet roof drain is incorrect.) 9. Revise the overflow drain on the specified combination roof drain and overflow drain to include a strainer. Reference: Section 1105.2, UPC 2006. 10. Provide a design for the roof drain conductors; i.e. show the material, sizes, routes, terminations, and slopes of the conductors. Reference: Chapter 11, UPC 2006. 11. The specified drinking fountain does not meet the accessibility requirements as shown in Section 1109.5, IBC 2006. 12. Provide insulation on the circulating hot water piping per Section 504.5, IECC 2006. |
| 05/02/2011 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Denied | 1. The 2006 International Mechanical Code with Local Amendments is the relevant code for this project. 2. Provide energy code compliance calculations for the building envelope (the correct climate zone is Pima County < 4,000 feet). Provide sufficient detail on the drawings to evaluate the energy compliance of the building envelope. The information shall, as a minimum, include U-factors of the envelope systems and fenestration components, along with the R-values of the insulation and the SHGC for the fenestration. Reference: Sections 101.4 and 104.2, International Energy Conservation Code 2006. 3. Provide updated energy code compliance calculations for the building mechanical systems. Reference: Section 101.4, International Energy Conservation Code 2006. 4. Provide guards for equipment located within 10 feet of a roof edge or of a walking surface that is elevated more than 30 inches above the adjoining grade. Reference: Section 304.10, IMC 2006. 5. Clarify the sequence of operation for the restroom exhaust fans. Schedule note # 7 and the electrical design show a switch that can be used to override the time clock which can in turn prevent the exhaust fan from exhausting all of the air supplied to the restrooms. Reference: Section 403.2.1 (4), IMC 2006. |
| 05/02/2011 | ROBERT SHERRY | WATER | REVIEW | Denied | Show the location of the existing water meter and reduced pressure backflow preventer for the building water service. |
| 05/07/2011 | RAY MAJUTA | ELECTRICAL-COMMERCIAL | REVIEW | Denied | T11CM01094 899 N Wilmot, Medical Bldg Expansion 1. Provide fault currents levels at panels. 2. Circuit A-37 feed 277v fixtures, Panel A is 120/208v 3p Ray Majuta PDSD, City of Tuc, Elect Pln CK, 5/7/11 |
| 05/12/2011 | STEVE SHIELDS | ZONING | REVIEW | Denied | DSD TRANSMITTAL FROM: Steve Shields Lead Planner PROJECT: San Raphael Medical PLaza T11CM01094 Building Plan (1st Review) TRANSMITTAL DATE: May 12, 2011 1. The building plan has been reviewed by Zoning Review Section but cannot approve the plan until all zoning comments or concerns have been addressed. 2. Zoning can not approve the building plan until the Development plan has been approved. 3. Zoning will re-review the building plan on the next submittal to insure compliance with the approved Development plan. Additional comments may be forthcoming. If you have any questions about this transmittal, please contact me at Steve.Shields@tucsonaz.gov or (520) 837-4956 C:\planning\grading\t11cm01094.doc |
| 05/12/2011 | PAUL MACHADO | ENGINEERING | REVIEW | Approved |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 05/23/2011 | GERARDO BONILLA | OUT TO CUSTOMER | Completed |