Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - TI
Permit Number - T11CM01030
Review Name: COMMERCIAL - TI
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
04/08/2011 | MICHAEL ST. PAUL | ZONING | REVIEW | Approved | |
04/08/2011 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Denied | Show that the termination of the exhaust fan EF-1 is at least 10'-0" from the outside air intake from AC-1. |
04/08/2011 | RAY MAJUTA | ELECTRICAL-COMMERCIAL | REVIEW | Denied | T11CM01030 3867 N Oracle Rd Electrical plans denied: 1. Circuits B-9,11 as spares in panel ? 2. Water Heater and Shutter motor both on B-5 ? 3. Mechanical Plans Examiner requires Exhaust fan to come on when air flows into room not connected to light. Ray Majuta Elec Pln CK, PDSD, C of Tuc, 4/8/11, |
04/08/2011 | ROBERT SHERRY | WATER | REVIEW | Approved | |
04/08/2011 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Denied | 1. SHEET TS1: WITH 75 OCCUPANTS, THIS PROJECT REQUIRES 2 MALE AND 2 FEMALE WATER CLOSETS. REVISE. 2. SHEET A4.0 (DETAIL 2); STRUCTURAL CALCULATIONS (SHEET #2): CITY OF TUCSON AMENDMENTS TO THE IBC (1805.2) REQUIRE 18" DEPTH OF FOOTING TO GET 1500 PSF, OR 12" DEPTH FOR 1000 PSF. DETAIL 2 INDICATES 12" DEPTH, AND THE CALCS. INDICATE 1500 PSF. REVISE. 3. SHEET A4.0; DETAIL 3: A NOTE INDICATES 'STUDS PER ELEVATIONS'. WHERE ON THE ELEVATIONS ARE THEY LOCATED? VERIFY. 4. PROVIDE STRUCTURAL GENERAL NOTES. |
04/08/2011 | JASON GREEN | ENGINEERING | REVIEW | Approved | |
04/08/2011 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Denied | 1. All roof areas (e.g. the porch) shall be drained by roof drains, scuppers, or gutters. Reference: Section 1101.11.1, UPC 2006. 2. Provide listing information for the "c3100" Froet Industries roof drain - the company web site does not recognize that model number. 3. Provide structural calculations to show that the roof is capable of supporting the additional rain load due to the apparent height of the roof drain overflow. Reference: Sections 1101.11.1 and 1101.11.2.1, UPC 2006, and Section 1611.1, IBC 2006. 4. Revise the overflow drain to include a strainer. Reference: Section 1105.2, UPC 2006. 5. Show that the rainwater collector boxes are equipped with an overflow. Reference: Section 1101.11.2, UPC. |
04/08/2011 | MARTIN BROWN | FIRE | REVIEW | Approved | |
04/08/2011 | ERIC NEWCOMB | ADA | REVIEW | Passed | |
04/08/2011 | BETH GRANT | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Passed | |
04/13/2011 | CAGUILA1 | WWM | REVIEW | Needs Review |