Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - TI
Permit Number - T11CM01012
Review Name: COMMERCIAL - TI
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
04/08/2011 | MARTIN BROWN | FIRE | REVIEW | Approved | |
04/12/2011 | GERRY KOZIOL | WWM | REVIEW | Approved | |
04/21/2011 | RONALD BROWN | BUILDING-COMMERCIAL | REVIEW | Denied | 1. Sheet C1, note 18: Please change to read "with the 2006 IBC, Chapter 11 and ICC (ANSI 117.1, 2003 Edition). 2. Details A and X/A2: the top of the sink counter top may be no higher than 2'-10" as per ICC (ANSI 117.1), Section 606.3. 3. Is this facility sprinkled? Please document this status under the Development Data information, Sheet C1. 4. Please provide a hi/low water dispenser as required by the 2006 IBC, Section 1109.5 and ANSI 117.1, Section 602.4. 5. Generic code copied details are not acceptable. Please show all accessible code requirements on actual toilet elevations including dimensions horizontal and vertical, accessories, and fixture and maneuverability clearances. 6. Please provide complete structural mounting details and calculations for the following mechanical systems. a. The Four condensing units mounted on the roof b. All fan coil units suspended from the structure with unistrut brackets c. The condensing unit mounted on the outside wall just West of the main entrance. Insure minimum of 7'-0" above finished sidewalk of any supporting structure. END OF REVIEW |
04/26/2011 | RAY MAJUTA | ELECTRICAL-COMMERCIAL | REVIEW | Approved | |
04/27/2011 | ROBERT SHERRY | WATER | REVIEW | Denied | Revise the site plan to show the size and route of the building water supply along with the location and size of both the water meter and the reduced pressure backflow preventer assembly. Reference: Section 103.2.3, UPC 2006. |
04/27/2011 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Denied | 1. The specified drinking fountain does not meet the accessibility requirements as shown in Section 1109.5, IBC 2006. 2. Show the size, route and termination of the T&P relief piping for the existing water heater. Reference: Sections 101.4.1.3 and 608.5, UPC 2006. 3. Complete the waste and vent isometrics. Reference: Section 103.2.3, UPC 2006. 4. Clarify the activities occurring in the ink room. Verify that no deleterious substances will be introduced into the existing floor drain. Reference: Sections 306.0 and 1009.1, UPC 2006. 5. Provide a floor drain in the restroom. Reference: Section 411.2, UPC 2006. 6. Show that the floor of the restroom slopes toward the floor drain. Reference: Section 411.2, UPC 2006. 7. Show how the temperature of the hot water supply to the public lavatories is controlled. Reference: Section 413.1, UPC 2006 and Section 504.3, IECC 2006. 8. Clarify the branch piping sizes for the urinal flush valves. A ¾", Type L copper branch pipe will result in water velocities greater than 8 FPS. Limit the water velocity to less than 8 FPS for the copper piping. Reference: Sections 610.12 and A 6.1, UPC 2006 and IS 3-2003, Section 2.6. 9. A drinking fountain has a 1-1/4" tail piece and minimum trap and trap arm size of 1-1/4"; the maximum trap size is 1-1/2". Reference: Table 7-3 and Section 1003.3, UPC 2006. 10. The minimum size trap and trap arm for a service sink is 2". If P6 is not to be the service sink for the building, provide an additional sink to be a service sink. Reference: Table 7-3, UPC 2006 and Section 2902.1, IBC 2006. 11. Provide the rim elevation of the next upstream sanitary manhole and the first floor elevation. Determine the need for a backwater valve per Section 710.1, UPC 2006, as amended by the City of Tucson. |
04/27/2011 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Denied | 1. Show that the proposed split system heat pumps meet the requirements of Section 503, IECC 2006 for equipment efficiency and capabilities. 2. Specify the minimum resistance (R-value) of the duct insulation to be used on this project. The minimum insulation for ducts located in indirectly conditioned spaces within the building envelope is R-4.2 (installed). Reference: Section 503.2.7, IECC 2006, as amended by the City of Tucson. 3. The split system schedule on sheet M2 calls out five split systems; where is the fifth split system located? Reference: Section 106.3.1, IMC 2006. 4. Provide information on the sequence of operation for the restroom exhaust fan to show that all of the air supplied to the restrooms will be exhausted (i.e. the exhaust fan will be running whenever air is being supplied to the restrooms). Reference: Section 403.2.1 (4), IMC 2006. |