Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - TI
Permit Number - T11CM00984
Review Name: COMMERCIAL - TI
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
04/04/2011 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Denied | 1. Provide a specification for the proposed shower and shower drain. Show how freeze protection will be provided. Reference: Sections 106.3.1 and 305.6, IPC 2006. 2. Provide roof drainage calculations and plans. Provide overflow protection for the roof. Reference: Sections 1101.2, 1101.7, 1106.4, and 1107, IPC 2006. 3. Provide a design for the natural gas utilization equipment proposed for the ramada, including combustion air, flues, and termination of the gas piping. Reference: Section 106.3.1, IFGC 2006. |
04/04/2011 | DAVE MANN | FIRE | REVIEW | Denied | SEE COMMENTS ON ACTIVITY T11CM00868 |
04/05/2011 | DAVID RIVERA | ZONING | REVIEW | Denied | 1. Due to comments by review staff it appears that the development package site plan will have to be revised. Ensure that the Architectural site plan in the building package is revised to match the revised development plan. 2. While it appears that the building footprints match the unapproved version of the development plan foot prints the actual dimensions could not be verified. The building footprints on the development package are not dimensioned. Include a copy of the footprints from the development package or include it in the development package for review. 3. Ensure that the bicycle parking facilities are depicted on the first-floor plans sheets where applicable. 4. Zoning has reviewed the building plans for zoning requirements. While zoning finds the building plans in substantial compliance with the not-approved development package site the building plans cannot be approved at this time. All building plans must be approved by all commercial plans reviewers and approval of the development package is required. A copy of the approved and stamped development package must be included with the building plans on the next submittal. Also, there is an appeal to the MDR process pending and that must be addressed (prior to zoning approval). 5. Address zoning and all other comments prior to re-submittal of the building plans. |
04/05/2011 | GERRY KOZIOL | WWM | REVIEW | Denied | need to build public sewer need 3rd floor pcrwrd capacity review- 740-6547- Chad Amateau |
04/06/2011 | LEERAY HANLY | ELECTRICAL-COMMERCIAL | REVIEW | Denied | Provide cut sheets for equipment & motors |
04/06/2011 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Passed | |
04/06/2011 | RONALD BROWN | BUILDING-COMMERCIAL | REVIEW | Denied | SEE COMMENTS ON T11CM00868 |
04/06/2011 | LAITH ALSHAMI | ENGINEERING | REVIEW | Denied |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
05/24/2011 | DELMA ROBEY | OUT TO CUSTOMER | Completed |
05/24/2011 | DELMA ROBEY | REJECT SHELF | Completed |