Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Number: T11CM00828
Parcel: 117170110

Address:
135 S 6TH AV #A

Review Status: Completed

Review Details: SITE

Permit Number - T11CM00828
Review Name: SITE
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
03/23/2011 MARTIN BROWN FIRE REVIEW Approved
03/23/2011 JASON GREEN ENGINEERING REVIEW Denied DATE: April 1, 2011
SUBJECT: 135 S 6th Ave- Site Plan Engineering Review
TO: Metro Permit Inc., Attn: Lisa Bower
LOCATION: T14S R13E Sec13 Ward 6
REVIEWERS: Jason Green, CFM
ACTIVITY: T11CM00828 (Site Plan)


SUMMARY: Engineering Division of Planning and Development Services Department has received and reviewed the Site Plan (T11CM00828) for the above referenced property. Engineering Division does not recommend approval of the site plan at this time. The following items need to be addressed:


SITE PLAN COMMENTS:

1) Provide the signature on the professional seal on Sheet C1 for the civil engineer who prepared the sheet.

2) DS Sec.2-02: Provide all proposed improvements (patio, walls, sidewalk, etc) on both the architectural and civil sheets. The architectural site plan should provide all dimensions for the proposed sidewalks, gates, etc and the civil plan needs to show the patio improvements to show conformance between both plan sheets.

3) DS Sec.2-02.2.1.A.5: Revise the site plan to provide the lot lines, dimensions and bearing for the property boundaries on the site plan, Sheet s1.

4) DS Sec.2-02.2.1.A.6: Provide written approval from both TDOT and Real Estate Departments for the proposed right-of-way improvements and patio expansion within the public right-of-way. Provide all Real Estate conditions on the site plan, i.e. Temporary Revocable Easement with conditions.

5) DS Sec.2-02.2.1.A.8: Clearly label all existing/proposed improvements on the architectural sheets. Label the bollards within the parking area; remove the existing curb line on Sheet s1 that is to be demolished per the civil sheet; label the widths of the proposed gates on the site plan sheet; show the existing patio on the north side of the building and label it as to remain or to be demolished.

6) DS Sec.2-02.2.1.A.11: Revise the site plan to show all minimum dimensions for the existing PAAL entrance off of 6th Avenue.

7) DS Sec.2-02.2.1.A.12: Provide the dimension for the existing bike lane along 6th Avenue verify that the bike lane width is consistent after construction of the new curb and gutter. It is recommended to revise the typographical error on Sheet c1 to read "Bike Lane" instead of Biker Lane

8) DS Sec.2-02.2.1.A.12: Refer to comments from Ron Brown, RA Structural Plans Examiner for any handicap and ANSI Standard requirements that may apply to this project.

9) DS Sec.2-01.2.1.A.19: Revise the site plan to label and dimension the public right-of-way for 6th Avenue. Label the road as "Public."

10) DS Sec.2-01.2.1.A.21: Revise the site plan to label the dimensions from street monument lines to the existing/proposed curb, property line, sidewalk widths, utility lines, on street parking lane width, and patio improvements.

11) Provide the book and page number for the Basis of Elevation Section shown on Sheet C1. The City of Tucson Book and Page # must be referenced within the section.

12) Approval from TDOT Permits and Codes for all improvements within the public right-of-way will be required. A right-of-way use permit application will be required prior to any construction within the public right-of-way. Contact Thad Harvison, (520)-791-5100 or Thad.Harvison@tucsonaz.gov for all right-of-way requirements and permit applications.


GENERAL COMMENTS:

Please provide a revised site plan that addresses the comments provided above. Include a comprehensive response letter addressing in detail responses to all of the above comments. Enclose "redlines" with the resubmittal package.

Further comments may be generated upon resubmittal of the plan review.

For questions or to schedule an appointment I can be reached at 837-4929.



Jason Green, CFM
Senior Engineer Associate
Engineering Division
COT Planning & Development Services
03/25/2011 STEVE SHIELDS ZONING REVIEW Denied PDSD TRANSMITTAL

FROM: Steve Shields
Lead Planner

PROJECT: Janos Downtown
T11CM00828
Site Plan (1st Review)

TRANSMITTAL DATE: March 25, 2011

COMMENTS: Please resubmit revised drawings and a response letter, which states how all Zoning Review Section comments regarding the Land Use Code and Development Standards were addressed.

1) This site plan was reviewed for compliance with the City of Tucson Development Standards (D.S.) and Land Use Code (LUC). This project has been reviewed for the area of expansion only.

2) Provide a copy of the last approved site plan.

3) Provide written documentation from either COT Transportation or Real Estate allowing the use of the right of way.

4) D.S. 2-02.2.1.A.Provide a site plan drawn at a standard engineering scale no larger than l" = 60' not at an architectural scale.

5) D.S. 2-02.2.1.A.5 Provide the lot dimensions and bearings on the site plan.

6) D.S. 2-02.2.1.A.6 For all buildings and structures on site provide the size and height. Show any overhangs, canopies, and the use one the site plan.

7) D.S. 2-02.2.1.A.6 Show patio along the north side of the building.

8) D.S. 2-02.2.1.A.10 If applicable show the sight visibility triangles (SVTs) on the site plan.

9) D.S. 2-02.2.1.A.18 Label Sixth Street as a Major Streets and Routes (MS&R).

10) D.S. 2-02.2.1.A.19 Dimension the right-of-way, including any applicable Major Streets and Routes (MS&R) Plan right-of-way.

11) D.S. 2-02.2.1.A.28 Provide the existing zoning of parcel and adjacent parcels, including those across streets and alleys.

12) D.S. 2-02.2.1.A.31 Provide the existing and proposed use on the plan based on a use listed in the LUC. If applicable be sure to include any subject to section.

13) D.S. 2-02.2.2.A.1 Provide the gross lot area on the site plan.

14) D.S. 2-02.2.2.A.2 Provide the floor area for all structures on site.

15) D.S. 2-02.2.2.A.3 Provide a Floor Area Ratio (FAR) calculation on the plan that includes the allowed and proposed FAR.

16) D.S. 2-02.2.2.A.6 Provide a building/use expansion calculation. The expansion calculation is a cumulatively calculation.

If you have any questions about this transmittal, please contact me at Steve.Shields@tucsonaz.gov or (520) 837-4956.

C:\planning\site\2011\t11cm00828

RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised site plan.
03/30/2011 RONALD BROWN H/C SITE REVIEW Denied 1. Accessible review depending on approval of Zonning comment 3.
04/05/2011 ANDREW CONNOR LANDSCAPE REVIEW Denied Provide written approval from the COT Transportation Department for use of the right of way.

Ensure that all Zoning & Engineering comments and concerns are addressed.
04/05/2011 ANDREW CONNOR NPPO REVIEW Passed
04/07/2011 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Passed

Final Status

Task End Date Reviewer's Name Type of Review Description
05/06/2011 DELMA ROBEY OUT TO CUSTOMER Completed
05/06/2011 SUE REEVES REJECT SHELF Completed