Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - TI
Permit Number - T11CM00733
Review Name: COMMERCIAL - TI
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
03/09/2011 | MARTIN BROWN | FIRE | REVIEW | Approved | |
03/16/2011 | GERRY KOZIOL | WWM | REVIEW | Approved | |
03/24/2011 | RONALD BROWN | BUILDING-COMMERCIAL | REVIEW | Denied | 1. This project is governed by the 2006 IBC which has as the ICC (ANSI 117.1 2003 Edition) as the compliant accessibility code. a. Please change all details and references from ADA to ICC (ANSI 117.1, 2003 Edition). b. Please review all accessibility design details and change them to be in compliance with the ICC (ANSI 117.1, 2003 Edition). c. An accessible compliant review for ADA Accessible Standards may be conducted upon an approved appeal to the building official, Mr. Ron Boose. If so desired, please complete a building official appeal and submit for review and approval. A fee of $132.00 is required for processing. 2. Generic details are not acceptable. Sheet nos. ADA1.0 and ADA 1.1 are mostly code copied details that that no relevance to the actual design of the accessibility elements of this project. a. Please delete all details not relevant to this project. b. Please provide all accessible requirements (dimensions and accessories) on the actual toilet design elevations and floor plan. 3. Please include the vertical grad bar in all required toilet elevations: A/A8.2, 1, 2, 6, and 7/A8.2. 4. Provide special inspections certification for review and approval: 1. Epoxy, bolts in concrete and reinforced concrete. 5. Existing building background on several of the floor plans are drafted too light. Please increase the line weight for the existing conditions for all floor plans and resubmit. 6. The urinal screen are 2' deep or more and as per Sections 605 and 305.7 the width must be 3'. 7. Please provide plumbing drawings. END OF REVIEW |
03/24/2011 | RAY MAJUTA | ELECTRICAL-COMMERCIAL | REVIEW | Denied | T11Cm00733 1818 E Speedway Electrical plans denied for the following: 1. All lettering and numbering to be min 3/32". 2. Date Load Calculation Report, 3. Identify circuits for power and lighting, show panel location, schedule and loads. Ray T Majuta, Elect Pln Ck, PDSD, City of Tucson, 3/28/11 Ray.majuta@tucsonaz.gov |
03/28/2011 | ROBERT SHERRY | WATER | REVIEW | Approved | |
03/28/2011 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Denied | Provide complete plumbing plans for the new work, including roof drainage, gas piping and flue modifications as well as water, waste and vent isometrics of the new work. Reference: Section 103.2.3, UPC 2006. |
03/28/2011 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Denied | 1. Verify that the two restrooms have adequate ventilation. Reference: Section 403.3, IMC 2006. 2. Provide a design and balancing data for the revised air distribution in the dining area. Reference: Sections 106.3.1 and 403.3.4, IMC 2006. |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
06/24/2011 | SUE REEVES | OUT TO CUSTOMER | Completed |
06/24/2011 | SUE REEVES | REJECT SHELF | Completed |