Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Number: T11CM00654
Parcel: 12511061B

Review Status: Completed

Review Details: CELL TOWER/ANTENNAS

Permit Number - T11CM00654
Review Name: CELL TOWER/ANTENNAS
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
03/04/2011 MARTIN BROWN FIRE REVIEW Approved
03/10/2011 MICHAEL WYNEKEN PLANNING-CITY HALL REVIEW Completed
03/11/2011 LOREN MAKUS ENGINEERING REVIEW Denied Provide a complete site plan for the site.
03/11/2011 STEVE SHIELDS ZONING REVIEW Denied PDSD TRANSMITTAL

FROM: Steve Shields
Lead Planner

PROJECT: T11CM00654
3620 E. Speedway Blvd (1st Review)

TRANSMITTAL DATE: March 11, 2011

1. The Cell Tower plan has been reviewed by Zoning Review Section but cannot approve the plan until all zoning comments or concerns have been addressed.

2. A complete site plan which includes the all parking spaces, locations of dumpsters and loading zones, bicycle parking, and pedestrian sidewalks,

3. Full vehicle parking calculation count which includes the number of required and provided parking spaces,

4. A copy of the last approved site or development plan must accompany the next submittal to verify certain code approved requirements such as vehicle parking, locations of dumpster and loading zones Pedestrian sidewalks etc.,

5. Zoning will re-review the Cell Tower plan on the next submittal to insure compliance with the approved Special Exception process. Additional comments may be forthcoming.

If you have any questions about this transmittal, please contact me at Steve.Shields@tucsonaz.gov or (520) 837-4956

C:\planning\celltower\t11cm00654.doc
03/14/2011 ERIC NEWCOMB BUILDING-COMMERCIAL REVIEW Denied 1. SHEET S1.1; GENERAL STRUCTURAL NOTES: THESE NOTES APPEAR TO BE GENERIC AND NOT SPECIFIC TO THIS PROJECT. REVISE THE 'DESIGN LOADS', 'WIND' CRITERIA, 'SEISMIC' CRITERIA, AND 'FOUNDATION DESIGN' CRITERIA AS REQUIRED. REMOVE ALL DESIGN CRITERIA NOT USED ON THIS PROJECT.
2. SHEET S2.1 (FOUNDATION PLAN NOTES); GEOTECHNICAL REPORT (PAGE 13): THE PLAN NOTES INDICATE A DESIGN BASED ON 2000 PSF SOIL BEARING PRESSURE, WHILE THE GEOTECHNICAL REPORT INDICATES 1200 PSF. REVISE THE NOTES.
3. SHEET S2.1; SLAB FOUNDATION: PROVIDE THE LATERAL AND VERTICAL DESIGN CALCULATIONS FOR THE EQUIPMENT SHELTER FOUNDATION USING THE 1200 PSF ALLOWABLE SOIL BEARING PRESSURE.
4. GENERAL: PROVIDE WRITTEN RESPONSES TO ALL REVIEW COMMENTS.
03/23/2011 LEERAY HANLY ELECTRICAL-COMMERCIAL REVIEW Approved
04/01/2011 BRIAN HEFFERNAN COMMUNICATIONS REVIEW Denied NEED COMMUNICATION FORM

Final Status

Task End Date Reviewer's Name Type of Review Description
04/12/2011 SUE REEVES OUT TO CUSTOMER Completed
04/12/2011 SUE REEVES REJECT SHELF Completed