Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - TI
Permit Number - T11CM00643
Review Name: COMMERCIAL - TI
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
03/08/2011 | DAVE MANN | FIRE | REVIEW | Approved | |
03/10/2011 | JASON GREEN | ENGINEERING | REVIEW | Approved | |
03/16/2011 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Denied | 1. SHEETS A1.1/A1.2/A3/A5/A5.1; KEY NOTE 8.2: IS THE REFERENCE TO 2/A1 CORRECT? VERIFY. 2. SHEETS A1.1/A1.2/A3/A5/A5.1; KEY NOTE 8.4: IS THE REFERENCE TO 16/A5 CORRECT? VERIFY. 3. SHEETS A1.1/A1.2/A3/A5/A5.1; KEY NOTE 10.1: THIS PROJECT DOES NOT USE THE ADA ACCESSIBILITY GUIDELINES. REVISE THE REFERENCE TO THE ICC/ANSI A117.1-2003. 4. SHEETS A1.1/A1.2/A3/A5/A5.1; KEY NOTES 10.6/10.7/10.8: IS THE REFERENCE TO 1/A6 CORRECT? VERIFY. 5. SHEET A5; ELEVATIONS 5/6/7: DRINKING FOUNTAINS ARE REQUIRED TO BE HIGH/LOW OR SINGLE POINT-OF-USE DISPENSERS. REVISE. 6. SHEET A5; ELEVATIONS 2/3/4: THE VERTICAL GRAB BAR SHOULD BE LOCATED FROM THE BACK WALL. REVISE. 7. SHEET A5; ELEVATION 3C: PROVIDE DIMENSIONED ELEVATIONS FOR THE GRAB BARS IN THE SHOWER PER ICC/ANSI A117.1-2003, SECTION 608. 8. GENERAL: PROVIDE WRITTEN RESPONSES TO ALL REVIEW COMMENTS. |
03/22/2011 | GERRY KOZIOL | WWM | REVIEW | Denied | need wastewater plumbing demo drawings for this suite to match demo list prior to requesting wastewater credit from 5th floor |
03/25/2011 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Denied | 1. Coordinate the plumbing floor plans with the waste & vent and water riser diagrams (e.g. the detail tags on the plumbing plans refer to plumbing pages that are not in the drawing set and P-9 refers to both a drinking fountain and an existing sink). Reference: Section 106.3.1, IPC 2006. 2. Clarify the installation of P9 and P8 as shown in riser diagrams 3/P2.1 and 4/P2.1: is the ice maker hook-up directly above the drinking fountain and where is the drain for the drinking fountain. The architectural floor plans indicate that a point-of-use water dispenser is located where you show a dual-height water fountain (P8) located. Reference: Section 106.3.1, IPC 2006. 3. Clarify the locations of the FS-1 indirect waste receptors: they appear to be located within inaccessible, unventilated spaces. Reference: Section 802.3, IPC 2006. |
03/25/2011 | ROBERT SHERRY | WATER | REVIEW | Approved | |
03/25/2011 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Denied | 1. Clarify note 4 in the air device schedule; only the top third of the lettering is visible. Reference: Section 106.3.1, IMC 2006. 2. Clarify how compliance with Section 307.2.3 IMC 2006 (e.g.. provide auxiliary drain pans or secondary drain systems for fan coil units) has been obtained. 3. Positively pressurized exhaust ducts may not pass through a plenum. Reference: Section 601.4, IMC 2006. |
04/01/2011 | RAY MAJUTA | ELECTRICAL-COMMERCIAL | REVIEW | Denied | T11CM00643 6561 E Carondelet Dr Medical TI The electrical plans have been denied for the following: 1. Sheet E-7.1, the panel names on this sheet did not print. 2. Sheet E-7.1, Panel NL-1 has a 30/3 CB feeding a 60 Amp fused disconnect. 3. Sheet E-6.1, correct the name to circuits 1,3,5, Panel B to indicate Panel A without SRV. 4. Provide a total load calculation showing new load this project plus existing. Ray T Majuta, PDSD, C of Tuc., Elect Pln Ck, 4/3/11 Ray.majuta@tucsonaz.gov |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
04/05/2011 | CPIERCE1 | OUT TO CUSTOMER | Completed |
04/05/2011 | SUE REEVES | REJECT SHELF | Completed |