Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - TI
Permit Number - T11CM00591
Review Name: COMMERCIAL - TI
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 02/25/2011 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Passed | |
| 02/25/2011 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Passed | |
| 02/25/2011 | ROBERT SHERRY | WATER | REVIEW | Approved | |
| 02/25/2011 | RSHERRY1 | WWM | REVIEW | Passed | No new plumbing fixtures. |
| 02/28/2011 | DAVID RIVERA | ZONING | REVIEW | Approved | |
| 02/28/2011 | JASON GREEN | ENGINEERING | REVIEW | Approved | |
| 02/28/2011 | RAY MAJUTA | ELECTRICAL-COMMERCIAL | REVIEW | Denied | Project: T11CM00591 420 E Aviation #100 Electrical plans denied for the following: 1. The units must be considered individual and cut of from each by listed fire walls, currently showing openings between spaces. 2. The grounding systems for each service call for a 3/0 bc to go to existing ground system, the remodel of the existing services will require a new grounding system , unknown what was existing. All grounding systems will be required to be tied together per 250-58.Show the grounds for transformers tied into the system ground. 3. The fault current calculations appear incorrect, please review. 4. Sheet E-3, the feeder for #1 1600 A, 4 sets of 400mcm AL not large enough. 5. Sheet E-3, the feeder for #7 1200 A, 2 sets of 250mcm AL not large enough. 6. Sheet E-3 , the feeder for #6 2-350mcm together equal 700mcm requiring 2/0 grd per 250.66. 7. Sheet E-3 #8 4-600mcm together total 2400mcm requiring a 3/0 cu grd. 8. Provide an elevation drawing showing the entire 4 services and how they will be located and where. Ray T Majuta, Elect Plan CK,PDSD, City of Tucson, 2/26/11 Ray.Majuta@tucsonaz.gov |
| 02/28/2011 | RONALD BROWN | BUILDING-COMMERCIAL | REVIEW | Passed | |
| 02/28/2011 | RONALD BROWN | ADA | REVIEW | Passed | |
| 02/28/2011 | DAVE MANN | FIRE | REVIEW | Approved | |
| 02/28/2011 | BETH GRANT | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Passed |