Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Active
Review Details: COMMERCIAL - TI
Permit Number - T11CM00549
Review Name: COMMERCIAL - TI
Review Status: Active
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
02/23/2011 | ANY | ZONING | REVIEW | Active | |
02/23/2011 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Denied | Show the size, route, and termination of the dryer exhaust ducts. Reference: Sections 504.1, 504.2, and 504.4, IMC 2006. |
02/23/2011 | RAY MAJUTA | ELECTRICAL-COMMERCIAL | REVIEW | Approved | |
02/23/2011 | ROBERT SHERRY | WATER | REVIEW | Approved | |
02/23/2011 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Denied | 1. SHEET S.1; FOUNDATION PLAN: DETAIL 5/S1 IS CUT ON THE PLAN, BUT THE DETAIL INDICATES "NOT USED". CLARIFY. 2. SHEET S.1; DETAIL 4: THE CITY OF TUCSON REQUIRES ALL LETTERING TO BE A MINIMUM OF 3/32" IN HEIGHT. REVISE. 3. STRUCTURAL CALCULATIONS; SHEET #9: WHERE IS THE FOOTING SIZE INDICATED IN THE CALCULATIONS? CLARIFY. 4. SHEET S.1; DETAIL 13: WHERE IS THE FIRE PIT LOCATED? INDICATE ON THE PLAN (OR REFERENCE ARCHITECTURAL). 5. SHEET S.1; DETAILS 6 AND 9: DETAIL 6 INDICATES2X4 STUDS, WHILE DETAIL 9 INDICATES 2X6. CLARIFY. 6. STRUCTURAL CALCULATIONS: WHERE IS THE SIGN LOCATED ON THE PLANS? CLARIFY. 7. GENERAL: PROVIDE MATERIAL STRENGTHS/SPECIFICATIONS AS REQUIRED ON THE PLAN. PROVIDE DESIGN CRITERIA ON THE PLAN. 8. GENERAL: PROVIDE WRITTEN RESPONSES TO ALL REVIEW COMMENTS. |
02/23/2011 | ANY | WWM | REVIEW | Active | |
02/23/2011 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Denied | 1. Revise the Plumbing General Notes (#11) to coordinate with the present activity. Reference: Section 103.2.3, UPC 2006. 2. Clarify the total gas load for this building; 3711 CFH as per the gas load table, or 3691 as per the note on sheet P.1. Reference: Section 103.2.3, UPC 2006. 3. Provide a waste and vent isometric for the clothes washers and the laundry sink. Reference: Section 103.2.3, UPC 2006. 4. Provide access to the cleanouts for the clothes washers per Section 707.10, UPC 2006. 5. Revise the overflow drain (detail 8/A.2) to comply with the requirements of Section 1105.2, UPC 2006 and to include a strainer. 6. Revise the gas pipe sizing per Section 1217.1, UPC 2006. 7. Provide details to clarify how the underground gas piping is to be sleeved and vented. Reference: Sections 103.2.3 and 1211.1.6, UPC 2006. |
02/23/2011 | ANY | ENGINEERING | REVIEW | Active | |
02/23/2011 | ANY | FIRE | REVIEW | Active | |
02/23/2011 | ERIC NEWCOMB | ADA | REVIEW | Passed | |
02/23/2011 | BETH GRANT | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Approved |