Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Number: T11CM00549
Parcel: 13323193C

Address:
750 N KOLB RD

Review Status: Active

Review Details: COMMERCIAL - TI

Permit Number - T11CM00549
Review Name: COMMERCIAL - TI
Review Status: Active
Review Date Reviewer's Name Type of Review Description Status Comments
02/23/2011 ANY ZONING REVIEW Active
02/23/2011 ROBERT SHERRY MECHANICAL-COMMERCIAL REVIEW Denied Show the size, route, and termination of the dryer exhaust ducts. Reference: Sections 504.1, 504.2, and 504.4, IMC 2006.
02/23/2011 RAY MAJUTA ELECTRICAL-COMMERCIAL REVIEW Approved
02/23/2011 ROBERT SHERRY WATER REVIEW Approved
02/23/2011 ERIC NEWCOMB BUILDING-COMMERCIAL REVIEW Denied 1. SHEET S.1; FOUNDATION PLAN: DETAIL 5/S1 IS CUT ON THE PLAN, BUT THE DETAIL INDICATES "NOT USED". CLARIFY.
2. SHEET S.1; DETAIL 4: THE CITY OF TUCSON REQUIRES ALL LETTERING TO BE A MINIMUM OF 3/32" IN HEIGHT. REVISE.
3. STRUCTURAL CALCULATIONS; SHEET #9: WHERE IS THE FOOTING SIZE INDICATED IN THE CALCULATIONS? CLARIFY.
4. SHEET S.1; DETAIL 13: WHERE IS THE FIRE PIT LOCATED? INDICATE ON THE PLAN (OR REFERENCE ARCHITECTURAL).
5. SHEET S.1; DETAILS 6 AND 9: DETAIL 6 INDICATES2X4 STUDS, WHILE DETAIL 9 INDICATES 2X6. CLARIFY.
6. STRUCTURAL CALCULATIONS: WHERE IS THE SIGN LOCATED ON THE PLANS? CLARIFY.
7. GENERAL: PROVIDE MATERIAL STRENGTHS/SPECIFICATIONS AS REQUIRED ON THE PLAN. PROVIDE DESIGN CRITERIA ON THE PLAN.
8. GENERAL: PROVIDE WRITTEN RESPONSES TO ALL REVIEW COMMENTS.
02/23/2011 ANY WWM REVIEW Active
02/23/2011 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Denied 1. Revise the Plumbing General Notes (#11) to coordinate with the present activity. Reference: Section 103.2.3, UPC 2006.
2. Clarify the total gas load for this building; 3711 CFH as per the gas load table, or 3691 as per the note on sheet P.1. Reference: Section 103.2.3, UPC 2006.
3. Provide a waste and vent isometric for the clothes washers and the laundry sink. Reference: Section 103.2.3, UPC 2006.
4. Provide access to the cleanouts for the clothes washers per Section 707.10, UPC 2006.
5. Revise the overflow drain (detail 8/A.2) to comply with the requirements of Section 1105.2, UPC 2006 and to include a strainer.
6. Revise the gas pipe sizing per Section 1217.1, UPC 2006.
7. Provide details to clarify how the underground gas piping is to be sleeved and vented. Reference: Sections 103.2.3 and 1211.1.6, UPC 2006.
02/23/2011 ANY ENGINEERING REVIEW Active
02/23/2011 ANY FIRE REVIEW Active
02/23/2011 ERIC NEWCOMB ADA REVIEW Passed
02/23/2011 BETH GRANT COMMERCIAL IMPACT FEE COMMERCIAL IMPACT FEE PROCESSING Approved