Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - TI
Permit Number - T11CM00526
Review Name: COMMERCIAL - TI
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
02/23/2011 | RONALD BROWN | ADA | REVIEW | Passed | |
02/23/2011 | GERRY KOZIOL | WWM | REVIEW | Denied | NEED TO SUBMIT ORIGINAL DRAWING ISSUED IN 2007 FOR LOFT APTS ON 3RD FL FOR CREDIT EVALUATION |
02/23/2011 | DAVE MANN | FIRE | REVIEW | Denied | Windows on west wall required to one hour rated glass block, per 2006 IFC, section 703 and the 2006 IBC. |
03/04/2011 | LEERAY HANLY | BUILDING-COMMERCIAL | REVIEW | Denied | 1) PLEASE PROVIDE DETAILS FOR 1 HOUR RATED WALLS INCLUDING FIRE-STOP DETAILS. SIMILARLY PLEASE PROVIDE CUT SHEETS FOR ANY MATERIALS INTENDED TO BE USED FOR WHAT APPEARS TO BE A GLASS FIRE PARTITION. 2) PROVIDE DETAILS FOR 8 FOOT HIGH PARTITIONS. 3) PROVIDE ELEVATIONS FOR SHOWER INDICTATING COMPLIANCE WITH ANSI 117.1. 4) PROVIDE ELEVATIONS FOR KITCHENETTE INDICATING COMPLIANCE WITH ANSI 117.1 5) PLEASE PROVIDE FRAMING DETAILS FOR ALL GLASS WALLS AT KITCHENETTES, CONFERENCE ROOMS, ETC. 6) 7) DETAIL D PP A3.1 CALLS FOR SPLAYED BRACING WIRE FOR GYP-BOARD CEILING. PLEASE SHOW MAXIMUM SPACING OF THESE WIRES. 8) PP A3.1 CALLS FOR 3x8x8 GLASS BLOCKS AT SOME OPENINGS ALONG THE EAST WALL BY THE RESTROOMS. PROVIDE ALL LINTEL AND FRAMING DETAILS FOR REPLACING THE EXISTING BRICK. ALSO PROVIDE CUT SHEETS FOR THE GLASS BLOCK YOU INTEND TO USE. 9) THE LARGE CONFERENCE ROOM REQUIRES 2 EXITS (IBC SECTION 1015). 10) PROVIDE FIRE SAFING DETAILS FOR DUCT PENETRATIONS OF RATED CORRIDOR WALLS PER SECTION 712 & 716 OF THE THE IBC. 11) PROVIDE STRUCTURAL ANALYSIS FOR NEW EQUIPMENT TO BE PLACED ON ROOF. |
03/07/2011 | LEERAY HANLY | ELECTRICAL-COMMERCIAL | REVIEW | Approved | |
03/07/2011 | LHANLY1 | ZONING | REVIEW | Passed | PER ERNIE DUARTE |
03/08/2011 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Denied | 1. Revise the background of the building to match the current architectural design. Reference: Section 106.3.1, IMC 2006. 2. Show how the fan coils are being connected to the building structure and provide calculations to show that the building structure is not being adversely affected. Reference: Section 302.1, IMC 2006. 3. Show how adequate access is being provided for the equipment located above the corridor ceiling. Reference: Section 306.3, IMC 2006. |
03/08/2011 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Denied | 1. Revise the background of the building to match the current architectural design. Reference: Section 103.2.3, UPC 2006. 2. The 1" branch piping called out for the water closet flush valves will result in water velocities greater than 8 FPS. Limit the water velocity to less than 8 FPS for the copper piping. Reference: Sections 610.12 and A 6.1, UPC 2006 and IS 3-2003, Section 2.6. 3. Specify how the piping penetrations of the fire-rated partitions comply with Section 1501.1, UPC 2006. |
03/08/2011 | LHANLY1 | WATER | REVIEW | Approved | |
03/08/2011 | BETH GRANT | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Passed |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
03/11/2011 | DELMA ROBEY | OUT TO CUSTOMER | Completed |
03/11/2011 | SUE REEVES | REJECT SHELF | Completed |