Review Date Reviewer's Name Type of Review Description Status Comments
02/16/2011 MARTIN BROWN FIRE REVIEW Denied Please include the following fire sprinkler design criteria to the plans.
1. Flow data (static pressure, residual pressure, GPM)
Available from the Fire Department (520) 837-7029 or 837-7030.
2. The standard to be used in development of sprinkler system. (NFPA 13, NFPA 13R, or NFPA 13D)
3. The hazard classification of the building, including any special hazards.
4. The density required of the water supply.
Please review 2006 IFC, section 1008.1.9 regarding panic hardware and adjust plans accordingly.
Deferred submittals to include fire sprinklers ,fire sprinkler underground supply, and fire alarm plan.
When site plan submitted, please include existing hydrant location, with dimensions to building.
02/17/2011 GERRY KOZIOL WWM REVIEW Denied NEED WW/IWC REVIEW & APPROVAL
NEED TYPE III CAPACITY REVIEW & APPROVAL
02/25/2011 JASON GREEN ENGINEERING REVIEW Denied Building plan can not be approved until a copy of the approved Development Plan Package D11-0002 is provided.

Building Plan will be reviewed and approved once a copy of the D11-0002 is provided.
02/28/2011 RONALD BROWN BUILDING-COMMERCIAL REVIEW Denied 1. For the purpose of determining additional plan review fees, please provide a letter to the building official, Mr. Ron Boose, listing all deferred submittal items.
2. Please provide Certifications for those items requiring special inspections as outlined on Sheet S102.
3. Please clarify finish to be applied to the exterior cementitious board on all exterior elevations.
4. Please provide latest approved site development plan.
5. The minimum height lettering fonts is 3/32". Please revise all sheets that have fonts less than 3/32" and resubmit.
6. Generic accessibility details as show on Sheet A-6 are not acceptable. Those that are show are non-compliant. Please provide all required accessibility dimensions and accessories on the actual large scale floor plan and interior elevations in compliant with the 2006 IBC, ICC (ANSI 117.1).
7. Provide structural details and calculations for all roof top mounted HVAC equipment.
8. Provide structural calculations for the light standard foundations.
9. On the detail 1/A5, please show the accessible seating in the dining room and the outdoor patio as per the 2006 IBC, Section 1108.
10. Accessible toilet room signage must be located in compliance with ICC (ANSI 117.1), Section 703.11, not on the door as shown.
11. Detail 404/S400 is too generic to be used for both the two sizes of isolated footings for columns. Please show each footing, their calculated dimensions and reinforcing as per the structural calculations manual.
12. In the calculations manual, page 20, call out DF3.
13. On calculations page 31, please provide calculations for footing DF3.
END OF REVIEW
03/07/2011 RAY MAJUTA ELECTRICAL-COMMERCIAL REVIEW Approved
03/09/2011 ROBERT SHERRY WATER REVIEW Approved
03/09/2011 ROBERT SHERRY MECHANICAL-COMMERCIAL REVIEW Approved
03/09/2011 TERRY STEVENS ZONING REVIEW Denied 03/09/2011

Development Services Department
Zoning Review Section

Terry Stevens
Lead Planner

Comments:

1. The building plan has been reviewed by Zoning Review Section but cannot approve the plan until it has been approved by the Engineering, and Landscape Review Sections and until all zoning comments or concerns have been addressed.

2. Zoning could not verify that the building plan was in compliance with the approved development plan. Please submit two copies of the approved and stamped development, landscape, and NPPO plans with the next building plan submittal.

3. Zoning will re-review the building plan on the next submittal to insure compliance with the approved site/development plan. Additional comments may be forthcoming.
03/10/2011 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Denied 1. Include the hose bibbs in the water fixture unit calculations. Reference: Section 604.1, IPC 2006.
2. Revise the water heater schedule for WH-1 to include a means for controlling water thermal expansion. Reference: Section 607.3, IPC 2006.
3. Provide backflow protection for all appliances that are directly-connected to the water distribution system and indicate the type of backflow prevention device that is to be used for each appliance. Reference: Sections 608.1 and 608.16.1, IPC 2006, as amended by the City of Tucson.
4. Provide the first floor elevation of the building and the rim elevation of the next upstream manhole; determine if a backwater valve is required. Reference: Section 715.1, IPC 2006, as amended by the City of Tucson.
5. Revise the floor drain in the walk-in cooler to terminate with an indirect waste connection to comply with the requirements of Section 802.1.2, IPC 2006.
6. Provide a vent for the combination waste and vent system per Section 912.2.2, IPC 2006.
7. Provide calculations to show that the proposed scuppers comply with the capacity requirements of Table 1106.2, IPC 2006. (Note that scuppers act as weirs and not as horizontal pipes.) Reference: Sections 1101.7, 1102.6, and 1105, IPC 2006.
8. Provide overflow roof drainage. Reference: Sections 1107.1 and 1107.3, IPC 2006.
9. The three soft serve freezers (2A, 2E, and 4B) appear to be water-cooled. Provide information to show that each unit is provided with a water-saving device as required by Section 1201.3, IMC 2006, as amended by the City of Tucson and that the water consumption by each of these units no greater than 3 gallons per nominal ton per hour.

Final Status

Task End Date Reviewer's Name Type of Review Description
03/14/2011 GERARDO BONILLA OUT TO CUSTOMER Completed
03/14/2011 SUE REEVES REJECT SHELF Completed