Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - NEW
Permit Number - T11CM00419
Review Name: COMMERCIAL - NEW
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 02/08/2011 | MARTIN BROWN | FIRE | REVIEW | Approved | |
| 02/09/2011 | STEVE SHIELDS | ZONING | REVIEW | Denied | DSD TRANSMITTAL FROM: Steve Shields Lead Planner PROJECT: Car Wash - 5701 S. 12th Avenue T11CM00419 Building Plan (1st Review) TRANSMITTAL DATE: February 9, 2011 1. The building plan has been reviewed by Zoning Review Section but cannot approve the plan until all zoning comments or concerns have been addressed. 2. Zoning can not approve the building plan until the development plan has been approved. 3. Zoning will re-review the building plan on the next submittal to insure compliance with the approved and stamped site plan. Additional comments may be forthcoming. If you have any questions about this transmittal, please contact me at Steve.Shields@tucsonaz.gov or (520) 837-4956 C:\planning\grading\t11cm00419.doc RESUBMITTAL OF THE FOLLOWING IS REQUIRED: |
| 02/11/2011 | RONALD BROWN | BUILDING-COMMERCIAL | REVIEW | Denied | 1. Need approved site development plan. 2. Need geo-technical report. 3. Need special inspection certifications. SHEET S2.0 4. At the footing schedule, F2 calls for 1'6" wide footing while the calculations (page 28) call for 1'8" wide footing. Please clarify. SHEET S2.1 5. Where the perlins 8ZS3.25X105 are called out, the structural calculations (page 4) call for 8ZS3.23X085. Please clarify. END OF REVIEW |
| 02/14/2011 | BETH GRANT | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Completed | |
| 02/17/2011 | GERRY KOZIOL | WWM | REVIEW | Denied | NEED WW/IWC REVIEW & APPROVAL OF SAND /OIL INTERCEPTOR FOR CAR WASH- TOM TOMCHAK- 443-6200- 5025 W INA RD NEED WASTEWATER 5TH FLOOR CREDIT EVALUATION FOR ANY BLDGS DEMO'D WITH PLUMBING FIXTURES REMOVED |
| 02/23/2011 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Passed | Design of the watet heater flue is covered by Chapter 5, UPC 2006. |
| 02/23/2011 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Denied | 1. Provide material standards for all plumbing fixtures being provided by others. All plumbing fixtures and fittings shall be listed or labeled by a nationally-recognized, accredited conformity assessment company (e.g. UL, ETL, UPC, etc). Reference: Sections 301.1.1 and 401.1, UPC 2006. 2. Provide a detail of the water softener and water heater installation, including the valves, temperature and pressure relief, and expansion tank. Reference: Sections 103.2.3, 605.5, and 608.3, UPC 2006. 3. Provide the listing information for the water heater and water softener. Reference: Section 301.1, UPC 2006. 4. Verify the size of the flue for the water heater and provide information to show that it has not been oversized. Reference: Section 510.0, UPC 2006. 5. Revise detail 101/M1.0 to show the roof type specified for this building. Reference: Section 103.2.3, UPC 2006. 6. Show the location of the pressure reducing valve that will limit the water pressure to less than 80 PSI. Reference: Section 608.2, UPC 2006. 7. Clarify the location of "RPBP-1" noted in General Notes "A". Reference: Section 103.2.3, UPC 2006. 8. Show how the water supply piping is to be protected from freezing. Reference: Section 313.6, UPC 2006. |
| 02/23/2011 | ROBERT SHERRY | WATER | REVIEW | Denied | Provide the referenced civil plan (sheet 9, Private Water Plan) that shows the location and size of the water meter and backflow preventer for the water service. |
| 03/03/2011 | RAY MAJUTA | ELECTRICAL-COMMERCIAL | REVIEW | Approved | |
| 03/07/2011 | LAITH ALSHAMI | ENGINEERING | REVIEW | Denied | Laith Alshami, Engineering and Floodplain Review, 03/07/2011, Development Package has not been approved yet. |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 03/24/2011 | GERARDO BONILLA | OUT TO CUSTOMER | Completed |
| 03/24/2011 | SUE REEVES | REJECT SHELF | Completed |