Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Number: T11CM00419
Parcel: 13813001B

Address:
5701 S 12TH AV

Review Status: Completed

Review Details: COMMERCIAL - NEW

Permit Number - T11CM00419
Review Name: COMMERCIAL - NEW
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
02/08/2011 MARTIN BROWN FIRE REVIEW Approved
02/09/2011 STEVE SHIELDS ZONING REVIEW Denied DSD TRANSMITTAL

FROM: Steve Shields
Lead Planner

PROJECT: Car Wash - 5701 S. 12th Avenue
T11CM00419
Building Plan (1st Review)

TRANSMITTAL DATE: February 9, 2011


1. The building plan has been reviewed by Zoning Review Section but cannot approve the plan until all zoning comments or concerns have been addressed.

2. Zoning can not approve the building plan until the development plan has been approved.

3. Zoning will re-review the building plan on the next submittal to insure compliance with the approved and stamped site plan. Additional comments may be forthcoming.

If you have any questions about this transmittal, please contact me at Steve.Shields@tucsonaz.gov or (520) 837-4956

C:\planning\grading\t11cm00419.doc

RESUBMITTAL OF THE FOLLOWING IS REQUIRED:
02/11/2011 RONALD BROWN BUILDING-COMMERCIAL REVIEW Denied 1. Need approved site development plan.
2. Need geo-technical report.
3. Need special inspection certifications.
SHEET S2.0
4. At the footing schedule, F2 calls for 1'6" wide footing while the calculations (page 28) call for 1'8" wide footing. Please clarify.
SHEET S2.1
5. Where the perlins 8ZS3.25X105 are called out, the structural calculations (page 4) call for 8ZS3.23X085. Please clarify.

END OF REVIEW
02/14/2011 BETH GRANT COMMERCIAL IMPACT FEE COMMERCIAL IMPACT FEE PROCESSING Completed
02/17/2011 GERRY KOZIOL WWM REVIEW Denied NEED WW/IWC REVIEW & APPROVAL OF SAND /OIL INTERCEPTOR FOR CAR WASH- TOM TOMCHAK- 443-6200- 5025 W INA RD
NEED WASTEWATER 5TH FLOOR CREDIT EVALUATION FOR ANY BLDGS DEMO'D WITH PLUMBING FIXTURES REMOVED
02/23/2011 ROBERT SHERRY MECHANICAL-COMMERCIAL REVIEW Passed Design of the watet heater flue is covered by Chapter 5, UPC 2006.
02/23/2011 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Denied 1. Provide material standards for all plumbing fixtures being provided by others. All plumbing fixtures and fittings shall be listed or labeled by a nationally-recognized, accredited conformity assessment company (e.g. UL, ETL, UPC, etc). Reference: Sections 301.1.1 and 401.1, UPC 2006.
2. Provide a detail of the water softener and water heater installation, including the valves, temperature and pressure relief, and expansion tank. Reference: Sections 103.2.3, 605.5, and 608.3, UPC 2006.
3. Provide the listing information for the water heater and water softener. Reference: Section 301.1, UPC 2006.
4. Verify the size of the flue for the water heater and provide information to show that it has not been oversized. Reference: Section 510.0, UPC 2006.
5. Revise detail 101/M1.0 to show the roof type specified for this building. Reference: Section 103.2.3, UPC 2006.
6. Show the location of the pressure reducing valve that will limit the water pressure to less than 80 PSI. Reference: Section 608.2, UPC 2006.
7. Clarify the location of "RPBP-1" noted in General Notes "A". Reference: Section 103.2.3, UPC 2006.
8. Show how the water supply piping is to be protected from freezing. Reference: Section 313.6, UPC 2006.
02/23/2011 ROBERT SHERRY WATER REVIEW Denied Provide the referenced civil plan (sheet 9, Private Water Plan) that shows the location and size of the water meter and backflow preventer for the water service.
03/03/2011 RAY MAJUTA ELECTRICAL-COMMERCIAL REVIEW Approved
03/07/2011 LAITH ALSHAMI ENGINEERING REVIEW Denied Laith Alshami, Engineering and Floodplain Review, 03/07/2011,

Development Package has not been approved yet.

Final Status

Task End Date Reviewer's Name Type of Review Description
03/24/2011 GERARDO BONILLA OUT TO CUSTOMER Completed
03/24/2011 SUE REEVES REJECT SHELF Completed