Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Number: T11CM00082
Parcel: 13324010C

Review Status: Completed

Review Details: COMMERCIAL - TI

Permit Number - T11CM00082
Review Name: COMMERCIAL - TI
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
01/13/2011 MICHAEL ST. PAUL ZONING REVIEW Approved
01/13/2011 JASON GREEN ENGINEERING REVIEW Approved
01/14/2011 RAY MAJUTA ELECTRICAL-COMMERCIAL REVIEW Approved
01/14/2011 ROBERT SHERRY MECHANICAL-COMMERCIAL REVIEW Approved
01/14/2011 ERIC NEWCOMB BUILDING-COMMERCIAL REVIEW Denied 1. SHEET A1.0: THIS NEW TI IS FOR WORK IN VILLA 2. IT IS NOT CLEAR FROM THE TABLE ON THIS SHEET IF THE NEW OCCUPANCY LOAD IS INCLUDED IN THAT TABLE. PROVIDE THE DATA FOR THIS TI. CLARIFY.
2. SHEET A3.0; WALLS "A": PROVIDE VERTICAL GRAB BARS PER ICC/ANSI A117.1-2003, FIGURE 604.5.1.
3. SHEET A4.0; DETAILS 8 AND 9: PROVIDE STRUCTURAL CALCULATIONS FOR THE STEEL LINTEL OVER THE OPENING.
4. SHEET A4.0; DETAIL 2: PROVIDE VERTICAL GRAB BARS.
5. SHEET A4.0; DETAIL 7: PROVIDE BRACING AT THE TOP OF THE NEW INTERIOR WALLS TO RESIST LATERAL LOADS PER IBC SECTION 1607.13. INCLUDE BRACING SIZE, SPACING, AND CONNECTION TO THE TOP OF THE WALL. INCLUDE BRACING DETAIL AT THE EXISTING FRAMING ABOVE.
6. GENERAL: PROVIDE WRITTEN RESPONSES TO ALL REVIEW COMMENTS.
01/14/2011 ROBERT SHERRY WATER REVIEW Approved
01/14/2011 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Denied 1. Provide sufficient information to show that the installation of the new plumbing fixtures will not cause the existing water supply and sanitary waste systems to become overloaded. Reference: Section 101.5.1, UPC 2006.
2. The waste and vent schematic shows the new drainage piping connecting to an existing 4"building drain but plumbing floor plan shows an existing 3" building drain. What is the size of the existing building drain?
3. Clarify the nature of the "anti-scald" valve, i.e. to what standards is it made? Reference: Section 301.1.3, UPC 2006.
01/14/2011 DAVE MANN FIRE REVIEW Approved
01/14/2011 ERIC NEWCOMB ADA REVIEW Passed
01/14/2011 BETH GRANT COMMERCIAL IMPACT FEE COMMERCIAL IMPACT FEE PROCESSING Passed
03/21/2011 CAGUILA1 WWM REVIEW Needs Review