Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - TI
Permit Number - T11CM00081
Review Name: COMMERCIAL - TI
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 01/13/2011 | MICHAEL ST. PAUL | ZONING | REVIEW | Approved | |
| 01/13/2011 | ROBERT SHERRY | WATER | REVIEW | Approved | |
| 01/13/2011 | JASON GREEN | ENGINEERING | REVIEW | Approved | |
| 01/13/2011 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Denied | 1. Revise the insulation specified for the chilled water and heating water piping to comply with the requirements of Section 503.2.8, IECC 2006. (See also the piping material note on sheet M3.2.) 2. Clarify the operation of the HVAC system; is it a two-pipe system? Complete the air handler schedule to include the heating water characteristics. Reference: Section 104.2, IECC 2006. 3. Show how the fan coil is being connected to the building structure and provide the installed weight of the fan coil. Reference: Section 302.1, IMC 2006. 4. Provide the outside air calculations referenced on sheet M3.2. Reference: Section 403.3, IMC 2006, as amended by the City of Tucson. |
| 01/13/2011 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Denied | 1. Provide fixture descriptions for all plumbing fixtures. All plumbing fixtures and fittings shall be listed or labeled by a nationally-recognized, accredited conformity assessment company (e.g. UL, ETL, NSF, UPC, etc). Reference: Sections 301.1.1 and 401.1, UPC 2006. 2. The clear tubing material specified for connecting the HVAC condensate to the lavatory tailpipe is not approved for use as drainage piping. Reference: Section 701.0, UPC 2006. 3. Provide cleanouts sized per Section 707.11, UPC 2006 (i.e. the 3" section of drain pipe downstream of the shower connection requires a cleanout at least 2-1/2" in size). |
| 01/14/2011 | ERIC NEWCOMB | ADA | REVIEW | Passed | |
| 01/14/2011 | DAVE MANN | FIRE | REVIEW | Approved | |
| 01/14/2011 | BETH GRANT | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Passed | |
| 01/14/2011 | RAY MAJUTA | ELECTRICAL-COMMERCIAL | REVIEW | Denied | Project: T11CM00081 10 N Maguire Av The water heater shown in the panel schedule is not on the power plan, Plumbing Sheets appear to show hot water coming from a central location ? Ray T Majuta, Elect Pln CK, 1/14/11 |
| 01/14/2011 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Denied | 1. SHEET A1.0: THIS NEW TI IS FOR WORK IN VILLA 1. IT IS NOT CLEAR FROM THE TABLE ON THIS SHEET IF THE NEW OCCUPANCY LOAD IS INCLUDED IN THAT TABLE. PROVIDE THE DATA FOR THIS TI. CLARIFY. 2. SHEET A3.0; WALLS "B" AND "C": PROVIDE VERTICAL GRAB BARS PER ICC/ANSI A117.1-2003, FIGURE 604.5.1. 3. SHEET A4.0; DETAILS 10 AND 11: PROVIDE STRUCTURAL CALCULATIONS FOR THE STEEL LINTEL OVER THE OPENING. 4. SHEET A4.0; DETAIL 2: PROVIDE VERTICAL GRAB BARS. 5. SHEET A4.0; DETAIL 5: PROVIDE BRACING AT THE TOP OF THE NEW INTERIOR WALLS TO RESIST LATERAL LOADS PER IBC SECTION 1607.13. INCLUDE BRACING SIZE, SPACING, AND CONNECTION TO THE TOP OF THE WALL. INCLUDE BRACING DETAIL AT THE EXISTING FRAMING ABOVE. 6. SHEET A5.0; ROOM FINISH SCHEDULE: RESTROOMS REQUIRE SPECIAL WALL/FLOOR FINISHES PER THE IBC. PROVIDE. 7. GENERAL: PROVIDE WRITTEN RESPONSES TO ALL REVIEW COMMENTS. |
| 03/21/2011 | CAGUILA1 | WWM | REVIEW | Needs Review |