Permit Number: T11BU01146
Parcel: 13001001A

Review Status: Completed

Review Details: GRADING

Permit Number - T11BU01146
Review Name: GRADING
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
09/22/2011 ELIZABETH EBERBACH ENGINEERING REVIEW Denied DATE: September 22, 2011
TO: Prashant Kumar, P.E., Conestoga-Rovers & Associates
PROJECT: Proposed Drainage Improvement at Union Pacific Railroad
SUBJECT: Grading/Site Engineering Review submittal
LOCATION: 1255 S Campbell Av, Ward 5
REVIEWER: Elizabeth Leibold
ACTIVITY NUMBER: T11BU01146

SUMMARY: Proposed drainage improvements to the railyard at 1255 S Campbell Av are proposed to be constructed to direct stormwater runoff through a stormdrain pipe and swale system to an existing pipe and detention basin that conveys runoff to the Railroad Wash. The following comments shall be addressed for resubmittal:
GRADING PERMIT COMMENTS:
1) For permit processing, address the following comments:
a. Entitle plans as "site/grading and drainage plan".
b. Include 'yellow card' with resubmittal.
c. Add activity number T11BU01146 to the plans and front cover of drainage report.
2) DS Sec.10-02.8.5.1.3 Table 8.1 (page 8.06): Mannings value of 0.016 is used in the capacity analysis for the Railroad Wash. Revise report to assess increase of 100-yr event WSEL using acceptable Mannings value (value less than 0.032 would not be acceptable). Project may not increase the base flood elevation more than one-tenth of a foot per Tucson Code Sec. 26-5.2(5).
3) DS Sec.10-02.2.3.1.2.E.1: Address the following maintenance comments:
a. Clarify & specify the name, address, and telephone number of the person(s) and entity responsible for the ownership, operation, scheduled and unscheduled maintenance, and liability of drainage improvements described in the drainage report.
b. Add note that debris and trash shall be removed by pedestrian access from Railroad Wash. Removal methods shall not include the use of vehicles or construction equipment. No disturbance of existing vegetation, other than trimming, is allowed in the Railroad Wash.
4) DS Sec.10-02.2.3.1.6.A.4.a): On sheet GD-2, provide invert elevation at inlet to existing pipe at end of proposed swale.

For any questions, call me at 837-4934.

Elizabeth Leibold, P.E., CPM, CFM
Civil Engineer
Engineering Division
Planning & Development Services
09/23/2011 DAVID RIVERA ZONING REVIEW Denied Zoning has reviewed the grading plan and while the proposal does not impact any zoning reqiurements the plan cannot be approved until NPPO and engineering reviewers approve the plan. Comply with all comments made by the NPPO and Engineering reviewers. Zoning will review and aprrove the grading plan on the next submittal if approved by the NPPO and Engineering.
10/04/2011 ANDREW CONNOR NPPO REVIEW Denied Provide an NPPO plan per LUC 3.8 and DS 2-15 or acceptable documentation, which clearly indicates that the project will not impact Protected Native Plants. Such documentation includes photographs of the site taken from all sides of the property per DS 2-15.2.0.C.

Ensure that all Engineering comments and concerns are addressed

Final Status

Task End Date Reviewer's Name Type of Review Description
12/05/2011 FERNE RODRIGUEZ OUT TO CUSTOMER Completed
12/05/2011 SUE REEVES REJECT SHELF Completed