Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: SIGN CODE APPEALS AND ADVISORY BOARD
Permit Number - T10SA00193
Review Name: SIGN CODE APPEALS AND ADVISORY BOARD
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
05/19/2010 | DAVID RIVERA | ZONING | REVIEW | Completed | CDRC TRANSMITTAL FROM: David Rivera Principal Planner DSD Zoning Review Section PROJECT: T10SA00193 10142 E Golf Links Road Sorento Square Sign Variance Request Transmittal date: May 19, 2010 COMMENTS: 1. Any vegetation within the 30-foot SCZ Buffer that is removed to install the monument sign must be replaced and or the area around the proposed monument sign should be enhanced with additional vegetation common to the surrounding buffer area. If you have any questions about this transmittal, please call David Rivera, (520) 791-5608. |
05/21/2010 | JOHN BEALL | COMMUNITY PLANNING | REVIEW | Approved | SUBJECT: Sign Code Advisory And Appeals Board Application CASE NUMBER: T10SA00193 CASE NAME: 10142 E. Golf Links Road CROSS REFERENCE: C9-06-03, D09-0017 NEIGHBORHOOD PLAN: South Pantano Area Plan GATEWAY/SCENIC ROUTE: Gateway/Scenic COMMENTS DUE BY: 5/27/10 The applicant is requesting a sign variance in response to the designation of Houghton Road as a Scenic Corridor. It should be noted that on street intersections where a Scenic Route and a Gateway Route intersect, development review and criteria provisions of the Gateway Route apply for seven hundred feet along the Scenic Route from each side of the intersection (LUC 2.8.4.2.E). And the City Council recently removed the rezoning requirement for SCZ compliance on the corner parcel. The subject site is within the South Pantano Area Plan which discourages the extension of strip commercial development, and calls for consolidating commercial developments at major street intersections to encourage "one-stop shopping". The applicant's request to develop Sorrento Square with a comprehensive and consistent Master Sigh package is consistent with the policy direction provided in the South Pantano Area Plan. Given the proposed multiple tenants and land uses for this site, and the circulation constraints for turning into the site for north-bound traffic on Houghton Road, it is appropriate to have a Master Sign plan for the proposed commercial development. The applicant's proposed variances are consistent with the South Pantano Area Plan. ( X ) No Objection |
05/24/2010 | SUE MONTES | AGENDA | AGENDA TO BCC | Completed | |
05/24/2010 | SUE MONTES | LEGAL AD | PREPARE LEGAL AD | Completed | |
05/24/2010 | SUE MONTES | LEGAL AD | LEGAL AD TO PAPER, MAIL LEGAL AD | Completed | |
06/01/2010 | HEATHER THRALL | FIELD TRIP | FIELD TRIP | Completed | Glenn Moyer attended field trip with 5 SCAAB members to post the site. |
06/08/2010 | HEATHER THRALL | IT TECH | REQUEST SET UP OF EQUIPMENT | Completed | |
06/10/2010 | JOSE ORTIZ | DOT TRAFFIC | REVIEW | Completed | No Objections. |
06/16/2010 | SUE MONTES | REPORT | BEGIN STAFF REPORT | Completed | |
06/16/2010 | SUE MONTES | HEARING | SET HEARING DATE | Completed | |
06/16/2010 | HEATHER THRALL | SIGNS | SIGN CODE REVIEW | Completed | |
06/16/2010 | SUE MONTES | START | APPLICATION ACCEPTED | Completed | |
06/16/2010 | SUE MONTES | REPORT | STAFF REPORT TO ADMINISTRATOR | Completed | |
06/16/2010 | SUE MONTES | REPORT | DISTRIBUTE STAFF REPORT | Completed | |
06/16/2010 | SUE MONTES | REPORT | POWERPOINT PRESENTATION COMPLETE | Completed | |
06/16/2010 | SUE MONTES | REPORT | HEARING DATE | Completed | |
06/16/2010 | SUE MONTES | REPORT | HAVE IT UPLOAD PRESENTATION | Completed | |
06/23/2010 | SUE MONTES | DECISION | PREPARE SUMMARIES AND DECISION LETTERS | Completed | |
06/23/2010 | SUE MONTES | DECISION | EMAIL/MAIL DECISION LETTERS | Completed |