Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: SIGN CODE APPEALS AND ADVISORY BOARD
Permit Number - T10SA00186
Review Name: SIGN CODE APPEALS AND ADVISORY BOARD
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
05/19/2010 | DAVID RIVERA | ZONING | REVIEW | Completed | CDRC TRANSMITTAL FROM: David Rivera Principal Planner DSD Zoning Review Section PROJECT: T10SA00186 5301 S. Houghton Road Civano Sign Variance Request Transmittal date: May 19, 2010 COMMENTS: 1. Any vegetation within the 30-foot SCZ Buffer that is removed to install the monument sign must be replaced and or the area around the proposed monument sign should be enhanced with additional vegetation common to the surrounding buffer area. If you have any questions about this transmittal, please call David Rivera, (520) 791-5608. |
05/20/2010 | JOHN BEALL | COMMUNITY PLANNING | REVIEW | Approved | SUBJECT: Sign Code Advisory And Appeals Board Application CASE NUMBER: T10SA00186 CASE NAME: 5301 S. Houghton Road CROSS REFERENCE: NEIGHBORHOOD PLAN: Civano PAD GATEWAY/SCENIC ROUTE: Scenic COMMENTS DUE BY: 5/27/10 The applicant is requesting the following sign variances: 1) To exceed the height of freestanding sign to 11'-11" 2) To exceed the allowable square feet to 64 square feet 3) Allow freestanding sign to be placed in the Scenic Buffer The proposed sign is within the Civano PAD - Neighborhood 1 District, a master planned community that was designed on the principles of sustainability, including the configuration of land uses which minimize the use of fossil fuel and automobile travel. It was anticipated that Neighborhood 1 would develop outward from the Town Center. The goal was to provide a very close physical proximity between home-job-shopping. It should be noted that when the Civano master planned community was updated to include the Sierra Morado and Pavilions Districts, that the Pavilions commercial district was sited right on Houghton as the master developer stated that commercial land uses can not survive without direct exposure to major arterial roadways. The Civano PAD recognizes that the primary access to the Town Center will be from Houghton Road. The Civano PAD specifically calls out that non-residential uses, including those in the interior like the Town Center, take full advantage of the Houghton Road corridor as a major street to heighten retail exposure. And the non-residential uses within the Civano PAD are to provide commercial/employment services to the various Civano residential neighborhoods as well as to the surrounding communities. Although the freestanding sign will be placed in the Scenic buffer, this is consistent with the existing edge treatment found along this portion of Neighborhood 1. And it is consistent with the intent of the policies in the Major Streets and Routes Plan, which are concerned with the preservation of views and the natural qualities of the surrounding the area. The proposed sign appears to be integrated architecturally into an existing wall structure and landscape, mitigating any disturbance to view windows or the foreground. The double-sided sign promotes safe visibility along Houghton. The proposed request for a sign variance is consistent with the goals and objectives of the Civano PAD. ( X ) No Objection REVIEWER: JBeall DATE: 5/20/10 |
05/24/2010 | SUE MONTES | AGENDA | AGENDA TO BCC | Completed | |
05/24/2010 | SUE MONTES | LEGAL AD | PREPARE LEGAL AD | Completed | |
05/24/2010 | SUE MONTES | LEGAL AD | LEGAL AD TO PAPER, MAIL LEGAL AD | Completed | |
06/04/2010 | HEATHER THRALL | FIELD TRIP | FIELD TRIP | Completed | Field trip with Glenn, 5 members of SCAAB. Site Posted. |
06/04/2010 | HEATHER THRALL | IT TECH | REQUEST SET UP OF EQUIPMENT | Completed | |
06/10/2010 | JOSE ORTIZ | DOT TRAFFIC | REVIEW | Completed | No Objections. |
06/16/2010 | SUE MONTES | HEARING | SET HEARING DATE | Completed | |
06/16/2010 | HEATHER THRALL | START | APPLICATION ACCEPTED | Completed | |
06/23/2010 | SUE MONTES | REPORT | BEGIN STAFF REPORT | Completed | |
06/23/2010 | SUE MONTES | DECISION | PREPARE SUMMARIES AND DECISION LETTERS | Completed | |
06/23/2010 | HEATHER THRALL | SIGNS | SIGN CODE REVIEW | Completed | |
06/23/2010 | SUE MONTES | DECISION | EMAIL/MAIL DECISION LETTERS | Completed | |
06/23/2010 | SUE MONTES | REPORT | STAFF REPORT TO ADMINISTRATOR | Completed | |
06/23/2010 | SUE MONTES | REPORT | DISTRIBUTE STAFF REPORT | Completed | |
06/23/2010 | SUE MONTES | REPORT | POWERPOINT PRESENTATION COMPLETE | Completed | |
06/23/2010 | SUE MONTES | REPORT | HEARING DATE | Completed | |
06/23/2010 | SUE MONTES | REPORT | HAVE IT UPLOAD PRESENTATION | Completed |