Plan Review Detail
Review Status: Completed
Review Details: PIA SUBMITTAL
Plan Number - T10PI00006
Review Name: PIA SUBMITTAL
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 04/29/2010 | LANCE PETERSON | DOT STREET MAINTENANCE | REVIEW | Approved | No objection pertaining to Street Maintenance. |
| 05/07/2010 | JOSE ORTIZ | DOT TRAFFIC | REVIEW | Denied | |
| 05/07/2010 | RICHARD LEIGH | DOT ENGINEERING | REVIEW | Denied | May 5, 2010 SUBJECT: Miracle Mile and El Burrito Ave., Offsite Improvement Plans for City of Tucson Crime Lab PROJECT REVIEWER: Richard Leigh, DOT, Permits and Codes Section RESUBMITTAL REQUIRED: Permits and Codes Section has reviewed the PIA Plan and does not recommend approval of the PIA Plan at this time. The following comments need to be addressed in the next submittal. 1. Include the plan number "I-2010-010" in the title block of each sheet. 2. Include Development Services Department PIA activity number "T01PI00006"on cover sheet. 3. Include administrative address on cover sheet. 4. Use the City of Tucson PIA title block on sheet 1. 5. Revise title block so information is identical for all sheets except for sheet number. Extraneous labeling such as details of sheet or the street name may be labeled above title block. 6. Provide a approval signature line for ADOT on cover sheet. ADOT approval will be required prior to the City's approval. 7. Sheet 4: Provide a profile for the proposed curb and provide stationing and elevations for the beginning and ending of curb returns. Refer to redline plans for additional comments and comment details. If you have any questions, I can be reached at 837-6647 or Richard.Leigh@tucsonaz.gov |
| 05/10/2010 | RLEIGH1 | UTILITY CLEARANCES | COT STREETS DIVISION | Completed | |
| 05/10/2010 | RLEIGH1 | UTILITY CLEARANCES | COT WATER NEW DEVELOPMENT | Completed | |
| 05/10/2010 | RLEIGH1 | UTILITY CLEARANCES | PC WASTEWATER MGMT | Completed | |
| 05/10/2010 | RLEIGH1 | UTILITY CLEARANCES | QUEST COMMUNICATION | Completed | |
| 05/10/2010 | RLEIGH1 | UTILITY CLEARANCES | TUCSON ELECTRIC POWER CO | Completed | |
| 05/10/2010 | RLEIGH1 | UTILITY CLEARANCES | COX COMMUNICATION | Completed | |
| 05/10/2010 | RLEIGH1 | UTILITY CLEARANCES | SOUTHWEST GAS CORP | Completed | |
| 05/10/2010 | RLEIGH1 | UTILITY CLEARANCES | EL PASO NATURAL GAS | Completed | |
| 05/10/2010 | RLEIGH1 | UTILITY CLEARANCES | KINDER MORGAN ENERGY | Completed | |
| 05/17/2010 | GARY WITTWER | DOT LANDSCAPE | REVIEW | Denied | 1. What is the finish type on the bull nose concrete? 2. Is the irrigation POC an existing water meter? or new? 3. All of the irrigation equipment and details need to be per our standards. I will be glad to get all of those standards to you if you e-mail me or call. 837-6618 4. Landscape Note #1 - what are you refering to with the use of Pea Gravel???? 5. This system is an existing bubbler system. Not sure why you are changing it to drip. These larger tree need lots of water and that's hard to obtain from drip. We need to discuss with Street Maintenance. 6. The note about providing tree wells will need to be removed if we are going to drip irrigation,. |
| 06/02/2010 | RICHARD LEIGH | PIA COORDINATOR | CUSTOMER CALLED; PLANS @ AMBASSSADOR | Completed | |
| 06/02/2010 | RICHARD LEIGH | PIA COORDINATOR | OUT TO CUSTOMER | Completed |