Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Plan Review Detail
Review Status: Completed
Review Details: PIA SUBMITTAL
Plan Number - T10PI00004
Review Name: PIA SUBMITTAL
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
03/04/2010 | JOSE ORTIZ | DOT TRAFFIC | REVIEW | Denied | March 4, 2010 ACTIVITY NUMBER: T10PI00004 PROJECT NAME: 12th Ave - Pueblo High PROJECT ADDRESS: 3500 S 12TH AV PROJECT REVIEWER: Jose E. Ortiz PE, Traffic Engineer Resubmittal Required: Traffic Engineering does not recommend approval of the PIA Plan; therefore a revised PIA Plan is required for re-submittal. The following items must be revised or added to the plan. 1. Include a response letter with the next submittal that states how all comments have been addressed. 2. Install new (R3-5R) "RIGHT ONLY" signs and pavement marking per PCDOT & TDOT Signing Manual (2002) Chap 9-5D. 3. Provide right turn lane legends per PCDOT & TDOT Pavement Marking Design Manual 4-7. 4. Place the PIA and CDRC Case number on the cover sheet. 5. See redlines on the submitted drawings for all other comments and address the redlines. During the next submittal please re-submit the roll of redlines for back checking purposes. If you have any questions, I can be reached at 791-4259 x76730 or Jose.Ortiz@tucsonaz.gov |
03/12/2010 | RLEIGH1 | UTILITY CLEARANCES | COT STREETS DIVISION | Completed | |
03/12/2010 | RICHARD LEIGH | DOT ENGINEERING | REVIEW | Denied | March 12, 2010 SUBJECT: 12th Avenue Right Turn Lane and Median Modifications for Pueblo Magnet High School, PIA# T10PI0004 PROJECT REVIEWER: Richard Leigh, DOT, Permits and Codes Section RESUBMITTAL REQUIRED: Permits and Codes Section has reviewed the PIA Plan and does not recommend approval of the PIA Plan at this time. The following comments need to be addressed in the next submittal. 1. Include the plan number "U-2010-003" in the title block of each sheet. 2. Include Development Services Department PIA activity number "T01PI00004"on cover sheet. 3. Include 12th Ave. in title of plan. "12th Avenue Right Turn Lane and Median Modifications for Pueblo Magnet High School" 4. Align provide plan and profile with plan view on sheet 2. Stationing in the profile view should line up with the stationing on the plan view. 5. Has right-of-way been dedicated or an easement been recorded for the proposed improvements. 6. Sheet 4, Detail 4,5, 6: Provide stationing and offsets for the proposed curb access ramp openings. Additionally, indicate slopes for the ramp and landing sections. 7. Sheet 4, Detail 5: Provide stationing, offsets and elevations for the BCRs and ECRs of the traffic island. Additionally, indicate the type of curb proposed and provide a cross section of the walk through area of the island. Refer to redline plans for additional comments and comment details. If you have any questions, I can be reached at 837-6647 or Richard.Leigh@tucsonaz.gov |
03/12/2010 | RLEIGH1 | UTILITY CLEARANCES | COT WATER NEW DEVELOPMENT | Completed | |
03/12/2010 | RLEIGH1 | UTILITY CLEARANCES | PC WASTEWATER MGMT | Completed | |
03/12/2010 | RLEIGH1 | UTILITY CLEARANCES | QUEST COMMUNICATION | Completed | |
03/12/2010 | RLEIGH1 | UTILITY CLEARANCES | TUCSON ELECTRIC POWER CO | Completed | |
03/12/2010 | RLEIGH1 | UTILITY CLEARANCES | COX COMMUNICATION | Completed | |
03/12/2010 | RLEIGH1 | UTILITY CLEARANCES | SOUTHWEST GAS CORP | Completed | |
03/12/2010 | RLEIGH1 | UTILITY CLEARANCES | EL PASO NATURAL GAS | Denied | |
03/12/2010 | RLEIGH1 | UTILITY CLEARANCES | KINDER MORGAN ENERGY | Denied | |
03/16/2010 | GARY WITTWER | DOT LANDSCAPE | REVIEW | Approved | |
03/16/2010 | LANCE PETERSON | DOT STREET MAINTENANCE | REVIEW | Denied | The triangular island proposed will block or divert the flow from south and standing water may stay within the driveway. The island need to allow the street runoff to go through without difficulty - depress the flowage line or provide open space. |
03/18/2010 | RICHARD LEIGH | PIA COORDINATOR | CUSTOMER CALLED; PLANS @ AMBASSSADOR | Completed | |
03/18/2010 | RICHARD LEIGH | PIA COORDINATOR | OUT TO CUSTOMER | Completed |