Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Plan Number: T10PI00001
Parcel: Unknown

Address:
3434 S KINO PW

Review Status: Completed

Review Details: PIA SUBMITTAL

Plan Number - T10PI00001
Review Name: PIA SUBMITTAL
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
01/25/2010 RICHARD LEIGH DOT ENGINEERING REVIEW Denied January 26, 2010

SUBJECT: Tucson Marketplace Boulevard & Kino Parkway, PIA T10PI0001

PROJECT REVIEWER: Richard Leigh, DOT, Permits and Codes Section

RESUBMITTAL REQUIRED: Permits and Codes Section has reviewed the PIA Plan and does not recommend approval of the PIA Plan at this time. The following comments need to be addressed in the next submittal.

1. Include the plan number "I-2010-001" in the title block of each sheet.

2. Include Development Services Department PIA activity number "T01PI00001"on cover sheet.

3. Include plat recordation information of the Block Plat on cover sheet.

4. Indicate Floodplain Use Permit on cover sheet.

5. Lighten shading used for the proposed pavement areas in plan views.

6. Renumber sheets with sequential numbers, no letters.

7. Include in legend all symbols and lines used in drawing (see PC/COT S.D. 100).

8. Provide plan and profile on same sheet. Stationing in the profile view should line up with the stationing on the plan view. Additionally, include drainage structures in profile view.

9. Indicate the final surface treatment for proposed median islands.

10. Identify and reference structural plans for the proposed arc culvert on Tucson Market Boulevard in plan view. Additionally, provide stationing, offsets and elevations for the arc culvert and wing walls.

11. Verify that the proposed arc culver complies with the City of Tucson Active Practice Guidelines for Buried Arc Culverts (see attached).

12. Proposed asphalt must match existing asphalt on Kino Boulevard. Kino Boulevard currently has a 2" rubberized asphalt finished surface course.

13. Call out the location and reference bus bay details of the proposed bus bay on Kino Boulevard in the plan view. Additionally, use COT Bus Bay Details (see attached). COT detail calls out a 12" P.C.C. pavement section.

14. Provide a cross section of the proposed bus bay.

15. Provide a dimensioned detail of the median island pedestrian cross through at +/- 24+65 (Marketplace Boulevard). Additionally, a wider pedestrian refuge area with truncated domes should be provided.

16. Provide pedestrian access easements for the areas where the sidewalk encroaches into private property. Delineate and label all easements and dedications.

17. A drainage easement will be required for the proposed catch basin and associated storm drain pipe located at concentration point DA-1 (southwest corner of Marketplace Boulevard and Kino Boulevard).

18. Indicate the wing length for proposed catch basins on Kino Boulevard.

19. Provide a manhole at the proposed storm drain junction at 324+98.74, 44.21 LT (Kino Boulevard), (S.M.D.D. 10.9.1.8).

20. Provide a hydraulic analysis for sizing the proposed storm drain system at the intersection of Tucson Marketplace Boulevard and Nobel Way and within Nobel Way.

Refer to redline plans for additional comments and comment details.

If you have any questions, I can be reached at 837-6647 or Richard.Leigh@tucsonaz.gov
01/27/2010 RLEIGH1 UTILITY CLEARANCES COT STREETS DIVISION Denied
01/27/2010 GARY WITTWER DOT LANDSCAPE REVIEW Denied 1. Ghost Gum is not on the approved plant list.
2. Per the NPPO requirements you need to mitigate the Blue Palo Verde that will be removed.
3. Understory planting is pretty heavy. Are you sure they want to maintain this much planting.
01/27/2010 RLEIGH1 UTILITY CLEARANCES COT WATER NEW DEVELOPMENT Denied
01/27/2010 JOSE ORTIZ DOT TRAFFIC REVIEW Denied Traffic Engineering does not recommend approval of the PIA Plan; therefore a revised PIA Plan is required for re-submittal. See redlines on the submitted drawings and address prior to resubmittal. During the next submittal please re-submit the roll of redlines for back checking purposes.

Traffic Signal plans and associated redlines will be provided the week of February 1st. Bob Hunt is on vacation and will not be able to provide comments to the signal plans until the week of February 1st.
01/27/2010 RLEIGH1 UTILITY CLEARANCES PC WASTEWATER MGMT Denied
01/27/2010 LANCE PETERSON DOT STREET MAINTENANCE REVIEW Denied 1) From Plan pg. C10 - C19, should put plan & profile in the same page for revied; The balck highlighted area in the plan makes it difficult to review.
2) Pg. C6 of C26: Typical Kino Parkway Pavement Section: 2' ARAC, TACK Coat, 2.5' AC, 8" ABC, Compacted Subgrade.
3) Pg. C10, Information is not sufficient to address drainage at the intersection of Tucson Marketplace & Nobel.
4) From Plan Pg. C10 - C19, not sufficient information to verify the lateral drainage/standing water possibility.
01/27/2010 RLEIGH1 UTILITY CLEARANCES QUEST COMMUNICATION Denied
01/27/2010 LANCE PETERSON DOT STREET MAINTENANCE REVIEW Denied No objection pertaining to Street Maintenance - 02/22/2010
01/27/2010 RLEIGH1 UTILITY CLEARANCES TUCSON ELECTRIC POWER CO Denied
01/27/2010 RLEIGH1 UTILITY CLEARANCES COX COMMUNICATION Denied
01/27/2010 RLEIGH1 UTILITY CLEARANCES SOUTHWEST GAS CORP Denied
01/27/2010 RLEIGH1 UTILITY CLEARANCES EL PASO NATURAL GAS Denied
01/27/2010 RLEIGH1 UTILITY CLEARANCES KINDER MORGAN ENERGY Denied
01/28/2010 RICHARD LEIGH PIA COORDINATOR CUSTOMER CALLED; PLANS @ AMBASSSADOR Completed Please submit utility receipt letters with next submittal.
01/28/2010 RICHARD LEIGH PIA COORDINATOR OUT TO CUSTOMER Completed Please submit utility receipt letters with next submittal.