Permit Number: T10EL01575
Parcel: 99999999B

Review Status: Completed

Review Details: BILLBOARD-BLDG/ELEC30days

Permit Number - T10EL01575
Review Name: BILLBOARD-BLDG/ELEC30days
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
07/09/2010 LEERAY HANLY BUILDING-COMMERCIAL REVIEW Denied NO ENGINEERING OR LETTER FROM ENGINEER PROVIDED FOR 3/4" RIGID CONDUIT BENT AT 90 DEGREES TO SUPPORT FIXTURES.

TWO IDENTICAL PAGES IN ONE SET (3 OF 4 AND 4 OF 4) MISSING PAGE 2 OF 4 IN SECOND SET. [SHOULD HAVE 2 SETS OF 3 PAGES]
07/09/2010 LEERAY HANLY ELECTRICAL-COMMERCIAL REVIEW Denied MISSING PAGE 2 OF 3 IN SECOND SET OF DRAWINGS

PANEL SCHEDULE INDICATES USE OF 4 CIRCUITS, BUT ONE-LINE, RISER AND ELEVATION PLANS INDICATE USING ONLY 2 CIRCUITS.
07/29/2010 GLENN MOYER ADMINISTRATIVE ADMIN REVIEW Denied BRC Comments

Comments below are for the lighting modification & electrical repair
submittal for COT ID# 147 at 1300 West Valencia Road (T10EL01575).

Sheet 1 of 4

No comments.

Sheet 2 of 4

1. Notes (Bullet #13), Electrical Riser Diagram, West Elevation Rear View &
East Elevation Front View: clarify the number of replacement riser conduit
on the load side of the panel (one or two) and the number of replacement
conductors therein; number of existing conductors to be field confirmed.

2. Notes: add notation that no junction boxes or other fixtures where wire
connections are made to be installed or remain on the load side of the panel
other than those depicted on the plan.

3. Notes: add notation that any excess fixtures, conduit, connectors,
wiring, or breakers no longer being used to be removed.

4. West Elevation Rear View & East Elevation Front View: correct number of
#18 wires (from 5 to 6).

5. West Face Elevation & East Face Elevation: clarify whether an additional
junction box will be added or not with each of the new ballasts

6. Panel Schedule, East Elevation Front View & One-Line Diagram: change
number of circuits from two per face panel to one per face panel.

7. One-Line Diagram: depict ballasts.

8. Title Block: add Stipulation address.

Sheet 3 of 4

1. Title Block: add Stipulation address.

Sheet 4 of 4

1. Rear Elevation West Face: clarify whether an additional junction box
will be added or not with each of the new ballasts.

2. Rear Elevation West Face: reduce number of replacement conductors from
four to three (3).

3. Title Block: add Stipulation address.

Final Status

Task End Date Reviewer's Name Type of Review Description
09/08/2010 CPIERCE1 OUT TO CUSTOMER Completed
09/08/2010 SUE REEVES REJECT SHELF Completed