Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: BILLBOARD-BLDG/ELEC30days
Permit Number - T10EL01262
Review Name: BILLBOARD-BLDG/ELEC30days
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
08/03/2010 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Approved | |
08/03/2010 | LEERAY HANLY | ELECTRICAL-COMMERCIAL | REVIEW | Approved | |
09/08/2010 | GLENN MOYER | ADMINISTRATIVE | ADMIN REVIEW | Denied | BRC Comments Below comments on the lighting modification & electrical repair resubmittal (7/30/10) for COT ID# 595 at 9501 East I-10 (T10EL01262). Sheet 2 of 3 1. Panel Schedule: correct the new volt-amp entry for Circuit #1 and associated sums; based on the ballast manufacturer's stated input watts (248 watts per two lamp fixture (F96T12HO)) and the 125% continuous load factor that the EOR is including in the panel schedule, this figure should be 620 v-a for this circuit; if otherwise, provide the calculations as to how the v-a entry was arrived at; these entries need to be standardized for all pending and future panel schedules. 2. Panel Schedule & One-Line Diagram: include the volt-amps & circuitry for the time controller respectively. 3. Panel Schedule: indicate the number of light fixtures under circuit description for Circuit #1,. 4. Panel Schedule & One-Line Diagram: clarify whether the large enclosure (designated a "junction box" in the original submittal) is a 206 panel or not (its cabinet appears to have different dimensions than that for the 206); if not, make the appropriate changes, including the number of breaker spaces and the cabinet dimensions shown in the panel schedule. |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
09/22/2010 | CINDY AGUILAR | OUT TO CUSTOMER | Completed |