Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: BILLBOARD-BLDG/ELEC10days
Permit Number - T10EL01037
Review Name: BILLBOARD-BLDG/ELEC10days
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
05/06/2010 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Approved | |
05/11/2010 | RAY MAJUTA | ELECTRICAL-COMMERCIAL | REVIEW | Approved | |
06/01/2010 | GLENN MOYER | ADMINISTRATIVE | ADMIN REVIEW | Denied | Please find below comments on the lighting relocation & electrical repair submittal for COT ID# 49 at 713 West Speedway Boulevard (T10EL01037). Mark Mayer Billboard Review Committee 3361 East 23rd Street Tucson, Arizona 85713 520.326.4522 Sheet 1 of 3 1. Billboard Notes (#3) & Title Block: delete APN# entered and indicate location in ADOT right-of-way (former parcel number for this location may be included as well). 2. Title Block: Project Number: as it appears that the parcel number is being used to identify the project, it would appear that this number should be changed as well. Sheet 2 of 3 1. Notes: add notation on installation of conduit between the new panel box and ballasts, including conduit size and number of conductors. 2. Notes: add notation that no junction boxes to be used other than for wire connection purposes and that no junction boxes to be installed or remain other than those depicted on the plan. 3. Notes: add notation that number of #12 replacement conductors indicated includes ground wire. 4. Elevation: indicate the size of conduit between the panel box and ballasts and number and gauge of conductors. 5. Elevation: depict the tee where the two bundles of #18 ballast wire will branch & how the tee is to connect to the new ¾" rigid conduit. 6. Provide standard configuration for total service replacement, showing all connectors used (nipples, tees, service elbows, etc) and conductors. [Note: not required, but as first requested for resubmittal on T10EL00530 (2601 E. Grant), may be used as a standard detail if provided; three views preferred, but one view may suffice if all parts in one plane as in Sheet 2 resubmittal for T10EL00752; see also Sheet 2 of resubmittal for T10EL00836 (6501 S. Nogales) for a partial example in three-dimensional form]. Sheet 3 of 3 1. Provide top and end views detailing how two bundles of #18 ballast wire to branch and connect to the new ¾" support arm conduit. 2. Side View: add dimension between top stringer and top of upright/face panel (alternatively, either indicate uppermost stringer as "Top Stringer" or depict all four stringers). 3. Indicate mounting detail furthest to right on plan as side view (similarly as other two have been designated "rear elevation view" & "top view"). |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
09/08/2010 | CPIERCE1 | OUT TO CUSTOMER | Completed |
09/08/2010 | SUE REEVES | REJECT SHELF | Completed |