Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Number: T10EL01036
Parcel: 99999999B

Address:
1893 W PRINCE RD

Review Status: Completed

Review Details: BILLBOARD-BLDG/ELEC10days

Permit Number - T10EL01036
Review Name: BILLBOARD-BLDG/ELEC10days
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
09/13/2010 LEERAY HANLY BUILDING-COMMERCIAL REVIEW Approved
10/13/2010 LEERAY HANLY ELECTRICAL-COMMERCIAL REVIEW Approved
10/14/2010 GLENN MOYER ADMINISTRATIVE ADMIN REVIEW Approv-Cond BRC Comments

Below are comments on the lighting relocation (and now replacement) &
electrical repair second resubmittal for COT ID# 409 at 1893 West Prince
Road (T10EL01036).

Sheet 2 of 3

1. Notes (Bullet #2): add sentence indicating that the respective
replacements of the four (4) fluorescent light fixtures are allowed under
Subparagraph 8.5 of the Stipulation and that each replacement counts against
the stated limit of 50.

2. Notes (Bullets #7, #8 & #9): it is difficult to make distinctions
between the junction boxes in these entries; designate the location of the
respective single gang junction boxes (e.g., add suffixes in parentheses
such as "east face/upper/north"); in Bullet #9 clarify if ¾" EMT is the
intended entry (rather than ½" EMT).

3. Elevation: based on the Notes & Partial Plan View, it appears that there
are different conduit/conductor configurations for each face; specify which
face is being depicted (east/west) & provide a detail that shows the
differences in the conduit conductor configuration for the second face (and
change the note on same configuration accordingly); if the only difference
between the two faces is a tee being used on the opposite side to mirror the
lower junction box on the first side and a double run of conductors to/from
the first ballast, a note to that effect could suffice.

4. Elevation Detail: reference to ¾" existing rigid conduit appears to be
for new rigid conduit; if so, correct.

5. Panel Schedule: correct the volt-amp entries for Circuits #1 and #3 and
associated sums; based on input watts specified by the manufacturer (431
watts per two lamp fixture (F96T12VHO)) and the 125% continuous load factor
that the EOR has been including in the panel schedule, this figure should be
1077.5 v-a for each circuit; if otherwise, provide the calculations as to
how the v-a entry was arrived at; these entries need to be standardized for
all pending and future panel schedules.

6. Panel Schedule: height/width/depth entries do not match Square D panel:
correct entries or, if necessary, indicate not available.

7. Partial Plan View: five (5) junction boxes are called out, but only four
(4) are depicted; show fifth junction box; if two are stacked in this top
view, indicate where.

8. Partial Plan View: add circuit number for each light fixture.

9. Partial Vicinity Map: reinstate the TEP pole and overhead drop depicted
in the original submittal.

Sheet 3 of 3

1. Comment for future reference: New Ballast: indicate input watts for the
application.

2. Comment for future reference: Elevation: indicate that elevation is for
both sides where applicable.

Final Status

Task End Date Reviewer's Name Type of Review Description
10/14/2010 SUE REEVES APPROVAL SHELF Completed
10/14/2010 CPIERCE1 OUT TO CUSTOMER Completed