Permit Number: T10EL00910
Parcel: 120062070

Address:
4103 S 6TH AV

Review Status: Completed

Review Details: BILLBOARD-BLDG/ELEC30days

Permit Number - T10EL00910
Review Name: BILLBOARD-BLDG/ELEC30days
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
09/01/2010 LEERAY HANLY BUILDING-COMMERCIAL REVIEW Approved
09/01/2010 LEERAY HANLY ELECTRICAL-COMMERCIAL REVIEW Approved
09/08/2010 GLENN MOYER ADMINISTRATIVE ADMIN REVIEW Denied BRC Comments

Below are comments on the lighting modification & electrical repair
resubmittal (8/12/10) for COT ID# 194 at 4103 South 6th Avenue
(T10EL00910). The comment regarding the replacement panel is new, but the
upgrade from the current service configuration to a 206 panel is so
substantial where there is no requirement under the NEC, that it should be
addressed now for pending and future panel replacements on single-faced
billboards.

Sheet 2 of 3

1. Notes (Bullet #5), Manufacturer's Literature Sheet, Electrical Riser
Diagram, Elevation, Partial Plan View & Panel Schedule (including entries
for Amperes, Mains, Height, Width & Depth): change to replacement panel
(206PROG (206MRPS in the Elevation)) to a 122 panel; for a single faced
billboard, there is no need for the upgrade from the current throw switch
configuration to the 206 panel where a 122 panel is permissible under the
2005 NEC (230.79; two branch circuits maximum: one for timer controls and
one
for lighting) and is the more comparable replacement.

2. Panel Schedule: correct the volt-amp entries for Circuit #1 and
associated summations, based on the ballast manufacturer's stated input
watts (248 watts per two lamp fixture (F96T12HO)), if the 125% continuous
load factor is applied in the panel schedule, this figure should then be
312.5 v-a; if otherwise, provide the calculations as to how the v-a entries
were arrived at; these entries need to be standardized for all pending and
future panel schedules.

Sheet 3 of 3

1. Comment for future reference: New Ballast: include the manufacturer's
spec for input watts for the application.

Final Status

Task End Date Reviewer's Name Type of Review Description
09/22/2010 CINDY AGUILAR OUT TO CUSTOMER Completed