Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: BILLBOARD-BLDG/ELEC30days
Permit Number - T10EL00909
Review Name: BILLBOARD-BLDG/ELEC30days
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
09/20/2010 | LEERAY HANLY | BUILDING-COMMERCIAL | REVIEW | Approved | |
10/13/2010 | GLENN MOYER | ADMINISTRATIVE | ADMIN REVIEW | Approv-Cond | BRC Comments Comments below are for the second resubmittal for electrical repair for COT ID# 82 at 4862 East 22nd Street (T10EL00909). Sheet 2 of 2 1. Panel Schedule: correct the the volt-amp entries for Circuits #1 and #3 and associated summations; based on the ballast manufacturer's stated input watts (467 watts per two lamp fixture (F96T12VHO)) and the 125% continuous load factor that the EOR is utilizing, this figure should be 1167.5 v-a for Circuit #1; for Circuit #3, the plan does not state the ballast manufacturer/model number for the existing ballast, but assuming the standard Universal WPR-480-XLH-R (250 watts per two lamp fixture (F96T12HO)) and the 125% continuous load factor, the figure should be 312.5 v-a or thereabouts; if otherwise, provide the calculations as to how the v-a entries were arrived at; these entries need to be standardized for all pending and future panel schedules. |
10/13/2010 | LEERAY HANLY | ELECTRICAL-COMMERCIAL | REVIEW | Approved |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
10/14/2010 | SUE REEVES | APPROVAL SHELF | Completed |
10/14/2010 | CPIERCE1 | OUT TO CUSTOMER | Completed |