Permit Review Detail
Review Status: Active
Review Details: BILLBOARD-BLDG/ELEC30days
Permit Number - T10EL00908
Review Name: BILLBOARD-BLDG/ELEC30days
Review Status: Active
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 08/03/2010 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Approved | |
| 08/03/2010 | LEERAY HANLY | ELECTRICAL-COMMERCIAL | REVIEW | Approved | |
| 09/08/2010 | GLENN MOYER | ADMINISTRATIVE | ADMIN REVIEW | Denied | BRC Comments Below are comments on the lighting modification & electrical repair second resubmittal for COT ID# 473 at 2921 North 1st Avenue (T10EL00908). Sheet 2 of 3 1. Notes (Bullet #9): delete this note as its need has been superseded by the separate reference to the ground wire now bring used throughout the plan. 2. Panel Schedule: correct the new volt-amp entries for Circuits #1 and #3 and associated summations (in response to 5/31/10 Comment #8); based on the ballast manufacturer's stated input watts (248 watts per two lamp fixture (F96T12HO)) and the 125% continuous load factor that the EOR is including in the panel schedule, this figure should be 620 v-a for each of those circuits; if otherwise, provide the calculations as to how the v-a entries were arrived at; these entries need to be standardized for all pending and future panel schedules. 3. Elevation: for the wiring between the panel box and first ballast, delete the designation of four (4) conductors as it has been superseded by the separate reference to the ground wire now in the new clouded designation below. |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 09/08/2010 | GERARDO BONILLA | REJECT SHELF | RECEIVED |