Permit Review Detail
Review Status: Completed
Review Details: BILLBOARD-BLDG/ELEC30days
Permit Number - T10EL00908
Review Name: BILLBOARD-BLDG/ELEC30days
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 05/24/2010 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Approved | |
| 05/25/2010 | RAY MAJUTA | ELECTRICAL-COMMERCIAL | REVIEW | Approved | |
| 06/01/2010 | GLENN MOYER | ADMINISTRATIVE | ADMIN REVIEW | Denied | Please find below comments on the lighting modification & electrical repair resubmittal for COT ID# 473 at 2921 North 1st Avenue (T10EL00908). Mark Mayer Billboard Review Committee 3361 East 23rd Street Tucson, Arizona 85713 520.326.4522 Sheet 2 of 3 1. Notes: add notation that no junction boxes to be used other than for wire connection purposes and that no junction boxes to be installed or remain other than those depicted on the plan. 2. Notes: add notation that number of #12 replacement conductors indicated includes ground wire. 3. Elevation: indicate where branch between Circuits #1 & #3 occurs; if in one of the ballast enclosures, indicate which side (north face or south face); if in junction box below, depict junction box & show specific location; in either case, depict a truncated second branch showing the change from incoming four #12 conductors to three #12 conductors for each branch with notation that conduit/ballast configuration for second side is same as for first. 4. Elevation: depict liquid tite in curved form from ballasts to connection with new 3/4" rigid support arms (for example, see Sheet 2 of submittal for T10EL00830, but depict liquid tite coming out of side instead of bottom as new ballasts have no bottom knockout). 5. Elevation: clarify what "New 90" given that liquid tite already uses this ballast enclosure knockout; it appears that the logical configuration is for incoming circuit to come in through a tee between the two ballasts with the liquid tite connecting to the outer knockouts; clarify this configuration. 6. Elevation: for riser conduit, change reference from "existing panel" to "new panel". 7. Elevation: delete the UG service conduit below the meter (or designate as ground). 8. Panel Block: correct the entries for Circuits #1 & #3 to reflect two fixtures/ballasts with a total of four 110 watt lamps per circuit (shown as only 125 volt-amps per circuit). Sheet 3 of 3 No further comments. |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 07/30/2010 | CPIERCE1 | OUT TO CUSTOMER | Completed |