Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - TI
Permit Number - T10CM03232
Review Name: COMMERCIAL - TI
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 02/15/2011 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Denied | 1. Clarify the location of the water heater - in cabinet or on platform. 2. An indirect waste receptor cannot be located within a cabinet. Reference: section 804.1, UPC 2006. 3. Show that the proposed hub drain has the capacity to accept the discharge of the T&P relief without splashing or flooding. Reference: Section 804.1, UPC 2006. 4. Provide upper terminal cleanouts per Section 707.4, UPC 2006. |
| 02/17/2011 | STEVE SHIELDS | ZONING | REVIEW | Approved | |
| 02/17/2011 | MARTIN BROWN | FIRE | REVIEW | Approved | |
| 02/25/2011 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Approved | |
| 02/25/2011 | RAY MAJUTA | ELECTRICAL-COMMERCIAL | REVIEW | Approved | |
| 02/25/2011 | ROBERT SHERRY | WATER | REVIEW | Denied | Comment not addressed. Revise the site drawing to show the location and size of both the water meter and the reduced pressure backflow preventer assembly serving the office building. Reference: Section 103.2.3, UPC 2006 and Chapter 27, Article V, Section 27-76 (a), Tucson Code. http://www.tucsonaz.gov/water/docs/backflow-ord.pdf |
| 02/25/2011 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Denied | 1. SHEET C1: PROVIDE VICINITY MAP. 2. SHEET C1: ENLARGE KEY PLAN. 3. SHEET A1: PROVIDE A HIGH/LOW DRINKING FOUNTAIN OR SINGLE POINT-OF-USE DISPENSER. 4. SHEET A2: PROVIDE A VERTICAL GRAB BAR ON ELEVATION 5 PER ICC/ANSI A117.1-2003. 5. SHEET A6: REVISE HEIGHT OF SERVICE COUNTER TO MEET 2006 IBC REQUIREMENTS OF CHAPTER 11 FOR ACCESSIBILITY. |
| 02/25/2011 | GBONILL1 | WWM | REVIEW | Needs Review | |
| 02/25/2011 | ERIC NEWCOMB | ADA | REVIEW | Passed | |
| 02/25/2011 | GBONILL1 | ENGINEERING | REVIEW | Needs Review | |
| 02/25/2011 | BETH GRANT | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Passed |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 02/25/2011 | GERARDO BONILLA | OUT TO CUSTOMER | Completed |